2,387 results • Best match
SPL REPAIRS OTM ACCN BLDG NO T-28 OF SIKH REGIMENT AND SPL REPAIRS TO BLDG NO P-01 (1 TO 4) JCOs MD ACCN OF FD REGT AT DIPATOLI UNDER GE DIPATOLI
M & L for sand cushioning with a layer of sand 80 mm thick before laying of cable and 150 mm thick after laying of cable in trenches complete all as specified and directed.
PROVISION OF 50 BEDDED CRISIS WARD AND ADDITIONAL ALTERATION UPGRADATION OF BUILDING NO P-7/6 OPERATION THEATRE AT MH IN MILITARY STATION PITHORAGARH
M & L Sand cushioning to UG cables (8cm deep before laying of cable and 15 cm deep over the cable) Note Punned thickness only will be considered for payment.
REPAIR/ MAINTENANCE OF VARIOUS TYPE OF PUMPS, MOTORS, MOTORS PROTECTION PANEL AND CONNECTED WORK AT DALHOUSIE CANTT UNDER AGE(I) DALHOUSIE
Sand cushioning to underground cables provided with a layer of sand 8cm thick before laying the cable in trenches and 15cm thick after laying the cable in trenches complete all as specified. Note - for measurement purpose punned thickeness 18 CM shall be considered
Augmentation of sub-station of Dholpur station of Agra Division.
Excavation of cable trench:- This item shall be operated in conformity with IS:1255 (latest version) i.e. code of practice for installation and maintenance of HT/LT cables. The price shall cover cost of excavation of cable trench in all type of soil for laying LT cables and back filling the same with sieved earth and finishing the surface in its original condition after providing sand, & bricks in cross position. For LT/HT cables the trench shall be 600mm wide x 1000mm deep. In trench 29 the cable shall be covered with river sand at a depth of 100mm below the cable and 100mm above the cable than placing well-burned bricks continuously in crossposition through out the cable route in the ground. The bottom of the trench should level free from stones and sharp edge of rocks etc. At the termination a loop of 5 meter (approx) cable shall be kept as allowance and loops rings be formed as per the site condition, in the ground, The cost shall include the cost of all materials i.e. sand, bricks, cable route markers (grouted in the earth firmly with cement concrete so that it can not be uprooted by miscreants) etc at 25m. interval and each turn of the cable.
LIGHT/2026-27/2614-19 DATED 11.06.2026 S.NO. 01
P / L of Double wall corrugated HDPE pipe confirming to IS : 16205 P-24, Stiffness Class 750 N, Externally corrugated and having smooth surface inside with HDPE Coupler, Elbow, Tee at required Depth below the ground for laying cable of following Nominal Outer dia. MFR Test report from NABL accrediated is to be submitted.(Excavation of Earth & Back filling with compaction is to be Paid Extra)All as per pre approved by Engineer in-charge. For additional technical parameters of products/ work , refer Annexure "A" attached with this BSR. 63 mm
Signalling work in connection with Extension of shunting neck and converted into DN Goods loop line at Tilati station of Solapur Division.
400.00 route plan, 1.0 mt. deep and 300mm wide along side the track in normal soil/strata, conforming to distances as per cable route plan and refilling after cable laying. This work includes covering of cable laid to trench by loose soil for a layer of 50mm thickness after clearing of route, bushes etc. It shall be ensured that top of the cables laid is at a depth of 0.8 m or more. If it is less, then the width and depth shall be suitably increased and accordingly proportionate payment shall be made. In case depth of trench is not achievable due to site conditions, proportionate payment will be made as per procedure. The work shall be done as per extant practice on C.Rly & the instruction of Railway engineer at site. Drg No SK 805