Loading…
Loading…
2,704 results • Best match
Erection, Dismantling and Maintenance of HT/LT Line and Transformer center at DAKOR/ anywhere under Nadiad O&M Division including cost of Bolt & Nuts
LAYING/RELAYING OF CABLE IN CABLE TRENCH AND FROM GROUND LEVEL
"Electrical general construction work in connection with (i) Replacement of PI by EI at Kumhari and Sarona, (ii) Construction of Y-Link line from Durg direction line to Dallirajhara line at Maroda Yard and (iii) construction of EI building-01 no. & end goomty-04 nos. between DLBS-Durg; in Raipur division over S.E.C. Railway"
Laying of HT/LT PVC cable in 150mm semicircular RCC pipe( along the road/track,drain) (Rate per cable) and also laying of cable in trench.
QUANTUM OF WORKS INVOLVED IN REPLACEMENT OF OLD JAJAR O/H CONDUCTOR U/G XLPE CABLE OF 11 KV LINE LT LINE WITH PROVIDING ADDITIONAL POLE TO REDUCE LONG SPAN LENGTH OF 11 KV LINE AT DIFF. SITES AND CONSTRUCTION OF NEW 11 KV LINE FOR THE BIFURCATI
Laying of underground 11 KV XLPE Cable of size 3x300 sq mm by drilling (HDD method) including laying of HDPE Pipe as per RESPO Norms with complete all work as required. (All the required materials for above job shall be provided by contractor except 11 KV XLPE Cable size 3x300 sq mm)
SPECIAL REPAIR AND REPLACEMENT TO STREET LIGHTS SYSTEM AND CONVERSION OF LT OVER HEAD LINES TO UNDER GROUND AT CERTAIN LOCATION AND SPECIAL REPAIR TO ELECTRICAL WIRING IN CERTAIN BUILDINGS ALONGWITH CONNECTED ITEMS AT AF STATION SURATGARH
Supply and laying cable passing through pipe, 1100 volts grade heavy duty cable with PVC insulated aluminium conductor served with an inner sheathing of PVC tape armoured with galvanised steel wire or tape and overall PVC sheathed 10 sq. mm 3 core nominal cross section in service connections complete all as specified and directed.
PROVN OF DEFI OTM ACCN FOR 3 TRG BN OF 1 EME CENTRE UNDER GE (NORTH) SECUNDERABAD
Supply, Installing, Testing and Commissioning of 2C x 1.5 sq.mm cable of 1.1kv Grade XLPE, insulated, sheathed steel armoured with Copper Conductor Power Cables. The rates quoted for laying shall include laying of cables on surface with saddles, screws etc. including material and labour charge etc complete.
PROVN OF E/M SERVICES AND CERTAIN ASSOCIATED WORKS AT BUILDING NO P-289, STANDBY POWER SUPPLY FOR POL FOR DU AT LOGISTIC SECTION, POWER SUPPLY POINTS FOR SPORTS GROUND / FOOTBALL STADIUM PARADE GROUND,
Excavation in trenches not exceeding 1.5 m wide and not exceeding 1.5 m deep for laying of cables, pipes, foundation for poles etc., and getting out in hard/dense soil complete all as specified and as directed.