Loading…
Loading…
2,714 results • Best match
Proposed Store Building within the premises of CMOH office at Kanyapur Asansol in the district of Paschim Bardhaman RN24001297 Project ID HF262750630S000
Laying of two cables above 185 sqmm in an underground trench in single tier formation (horizontal), the trench size : 680 mm x760 mm average depth, with brick protection on the top of each cable 8 (eight) Nos. bricks per Mtr. and 4 (four) Nos. bricks per Mtr. as separator between the bricks and cables and also trench to be filled up with shifted soil, levelling up and restoring surface duly rammed.
Provision of CCTV surveillance system at 05 Parcel offices (GD, BST, GKP, STP, LMP) with 05 year AMC & Provision of Stainless Steel dustbin with grouting & Furniture in Baby Feeding corner at stations.
Horizontal direction drilling (HDD)/Trenchless digging/machine drilling without damage to surface road /track for laying/insertion of DWC/GI/HDPE pipe. The bore shall be done of 17 min. diameter 120 mm & at the depth of minimum 1400 mm from the ground level.The ground level shall be considered ignoring the bank height of the bank of the road/ track. Note:- DWC/HDPE/GI Pipe supply is not covered under this item. Contactor shall provide all material required for work and adequate nos. of labours for proper laying of cables into the bore. Cables shall be laid cautiously so that these should not get damage due to rough handling & pressure on cable. Payment of boring shall be made only after laying of DWC/HDPE/GI pipein the bore. Inspection Consignee Above/
(i) S&T work in c/w Raising of Passenger Platform no. 1 from Medium Level to High level along with extension upto 600 Meter at Chawapail station on UMB - LDH section. (ii) S&T work in c/w Raising of Passenger Platform no. 1 from Medium Level to High level along with extension upto 600 Meter at Doraha station on UMB - LDH section. (iii) S&T work in c/w Raising of Passenger Platform no. 1 from Rail Level to High level along with extension upto 600 Meter at Sadhugarh station on UMB - LDH section. (iv) Signalling work i.c.w.Shifting of OHE Portals from Goods Platforms to Avoid Obstruction in Vehicle Movement during Loading/Unloading at KART Station.
Testing & meggering of all types of outdoor cables after its laying and termination on 07 both ends under supervision of Railway representative. This also includes preparation of test report for core to core and core to earth on prescribed proforma for each core of the cable seperately. This also include dressing and lacing of cable on both ends. Proforma for testing and material for lacing to be supplied by the contractor. Inspection by: Consignee.
S&T work in Connection with-"Raising and extension of ML (Medium Level) platform to HL (High Level) platform with all passenger amenities at stations " MLI, KRW, BNGM, HP, GRI, CNL, BQN, DRS, AUWA, BWA, NANA, BNS, KVJ, BMN, MAA, KWI, MXO, SIM, SZA, DRB, VNTD and RGQ stations to eliminate the deficiencies of MEA at 22 stations " over Ajmer Division of NWR.
Laying of S&T Cables of various cores/ pairs/ quads in trenches/ GI pipes/ RCC pipes/ DWC pipes/ Trunking. This also includes laying of cables in track crossings & road crossings. Item includes provision of labels of coloured plastic adhesive tapes or any other identifiable material on 21 each cable to give the cable number at each Gantry Post/hectometer post.(Cables will be meggered before and after its laying by contractor under supervision of Railway Representative and he will submit the meggering report of each testing). Length of the cable laid includes the length of the cable coiled for termination purposes. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution(unit is RM running meter)
S&T work in Connection with-"Construction of a new platform at the second entry of Udaipur station with matching facilities for redevelopment activities for major station upgradation at Udaipur" over Ajmer Division of NWR.
Laying of S&T Cables of various cores/ pairs/ quads in trenches/ GI pipes/ RCC pipes/ DWC pipes/ Trunking. This also includes laying of cables in track crossings & road crossings. Item includes provision of labels of coloured plastic adhesive tapes or any other identifiable material on 23 each cable to give the cable number at each Gantry Post/hectometer post.(Cables will be meggered before and after its laying by contractor under supervision of Railway Representative and he will submit the meggering report of each testing). Length of the cable laid includes the length of the cable coiled for termination purposes. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution(unit is RM running meter)
Works Advertised Tender for Erection, Dismantaling and Maintenance of HT/LT and Transformer center and Under ground work For Kakanpur Sdn OR Any Other SDn Under Godhra O&M Division. Rates are inclusive of Supply of N B.
Laying / Relaying XLPE/PILC cable by digging of pits, removal of old cable and laying