Balance work for Improvement of power supply arrangement at KMPD Railway station.
11 11 Micro drilling & laying of cable under road & Metre 100.00 1585.89 158589.00
Construction of New Temples, Restoration of Existing Temples, and Development of Temple Plaza under Tourism Circuit from Saptarshi Ghat to Atal Ghat at Saptarishi Ghat, Riverfront East, Behrampura, Ahmedabad
8.2 crossing on or floor as directed for laying of cable. The pipes as following size of dia & weight per 6 mtr. 50 107 Mtr.
Construction of Skywalk with travelators at Anand Vihar multimodal hub for seamlessly connectivity between Anand Vihar Railway Station to ISBT, Kuashambi. For Complete Work details (Please refer IFB).
5 Supply at the site of work of HT, XLPE insulated, armoured, Aluminium conductor cables as per IS-7098/Part-II/1985 with up to date amendment & specified in the specifications of the sizes given below, laying of cables in trenches in all types of areas (normal soil, footpath, road etc) by excavation with laying arrangement with stand cushion and brick/brick tiles or shaped RCC cover protection as required/approved by utility owing agency at the required depth including refilling of trenches, testing & commissioning of cables etc as required 0
Part supply of signaling material, installation, testing & commissioning in connection with construction of ROB in lieu of LC No. 232/B at Km. 759/6-7 between station Kalol - Khodiyar, LC No. 228 at Km 753/4-5 between Kalol - Pnsar Road and LC No. 230 at km 756/4-5 between Kalol - Mahesana on Ahmedabad - Palanpur section of Ahmedabad Division(Re-invite).
Erection of relay racks, IDF with scaffolding arrangement, Cable termination rack with suitabale grounding arrangement at station. Insulators, grouting bolts, tripods to be supplied by Contractor. The item includes fixing of tag blocks on relay racks, CT rack Fixing of WAGO/phoenix terminals on CT racks on 3mm laminated hylum sheet or as per approved arrangement prescribed 03 by site engineer and drilling holes in the hylum strips as required. This also includes supply & erection of cable supporting laddrs on the back side. This includes supply and fixing of 3mm laminated hylum strips, square bars for fixing of WAGO/PHOENIX terminals & for supporting outdoor cable coming from cable pit. PVC Coated Sting Roads should be used to support the cables on CT Rack. This includes laying of cables coming from cable pit to CTR through ladders as per instructions of site in charge.
SPECIAL REPAIR /REPLACEMENT OF 125 KVA DG SET AGAINST BER FOR PUMP HOUSE, BAMBOLIM CAMP UNDER GE PANAJI, GOA
Supply, laying and testing cable XLPE Insulated ,screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 300 sqmm 3.5 core complete all as specified and as directed.
Construction of 1 No. of C-Type Qtr (Duplex) for Civil Judge (Jr Divn) cum J.M.F.C at Dampada with Approach Road, drain and Compound wall at Dampada in the District of Cuttack for the year 2024-25
Laying of MV cable upto 25sqmm in ground (5.1.1)