Loading…
Loading…
2,724 results • Best match
Providing ARC work of E.I. Work, AC Machine, Water Cooler, Freeze, TV, RO Plant, Geyser, Motor Pump Set and Television for various Building under R&B Electrical Division Bhavnagar.
Supplying and laying UPVC cable trunking system comprising unplasticised
Construction of New Building for General Nursing Hostel at General Hospital Santrampur Ta. Santrampur, Dist. Mahisagar
Supplying and laying UPVC cable trunking system
Renovation to the EI Work incl. special repairing to the compound lighting of Inspection Bungalow at Arambagh Highway Sub-Division, P.W. Roads Dte. in the district of Hooghly.
SUB-HEAD 8 -CABLE, LAYING, GLAND & SOCKET
SR TO ADMIN OFFICE BUILDING AT PORT JAFRABAD (2nd Attempt)
suitable width of 90 cms or required depth for laying cable
CONSTRUCTION OF GOVT., ST COLLEGE GIRLS HOSTEL AT BANSWADA (V AND M) IN KAMAREDDY DISTRICT
Supply and laying of 4.0 Core 35 Sq.mm under ground PVC XLPE armoured alluminium cable of make Polycab/RPG/ Finolex/ Havells / Paragon / V-Guard, 1100V grade with ISI mark by excavating trench in soil upto 0.9Mt deep laying the cable on sand/rock sand (50:50) cushion twenty centi meter (20 cm) thick and covering the cable with bricks and back filling the trench with excavated earth witohout stones or hard materials and making the surface proper duly providing route indicators embedded in cement concrete including cost and conveyance of all materials to site, labour charges for laying the cables and connections as per IS 1244 and as directed by Engineer-in-charges complete for finished item of work.
PROVIDING ADDITINAL AMENITIES TO YERUKALA ATMA GOURAVA BHAVAN AT NIZAMPET (V) OF BACHUPALLY (M) IN MEDCHAL-MALKAJGIRI DISTRICT
Supply and laying of 4.0 Core 35 Sq.mm under ground PVC XLPE armoured alluminium cable of make Polycab/RPG/ Finolex/ Havells / Paragon / V-Guard, 1100V grade with ISI mark by excavating trench in soil upto 0.9Mt deep laying the cable on sand/rock sand (50:50) cushion twenty centi meter (20 cm) thick and covering the cable with bricks and back filling the trench with excavated earth witohout stones or hard materials and making the surface proper duly providing route indicators embedded in cement concrete including cost and conveyance of all materials to site, labour charges for laying the cables and connections as per IS 1244 and as directed by Engineer-in-charges complete for finished item of work.