Loading…
Loading…
2,720 results • Best match
REPAIR/ MAINT/ REPLACEMENT OF LT PANEL, AND ALLIED WORKS IN BHAGAT LINE AND SOUTH AREA UNDER AGE E/M ELECT SUPPLY AT GE (U) E/M MEERUT CANTT.
M & L for Sand cushioning to UG cables (8cm deep before laying of cable and 15 cm deep over the cable). Note :- Punned thickness only will be considered for payment.
Rising Main from Lakes and Rivers to WTP in Puducherry
Laying of UG cable and providing termination of cable joint with suitable cable gland,cable socket etc. complete - 3.5 x 150 sqmm cable.
Bi-annual rate contract for erection of 66 kV Line feeder bay / transformer bay for various sub-stations under AM Division Jambuba under Jambuva Circle under R & M Plan 25-26 & 26-27
Before laying of control cable proper schedule of cable showing length of each cables is to be prepared
4403-Animal Husbandry Construction Of Main Building,C.C Road,Bore Well,Compound Wall & Demolation Of Existing Buildings in Veterinary Polyclinic At Vavol,Gandhinagar
Supplying and laying UPVC cable trunking
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING OF CHLORINATION SYSTEM WITH CHLORINE HANDLING STRUCTURE, AUTOMATIC CHLORINE LEAK ABSORBENT SYSTEM, AND SAFETY EQUIPMENT AT NIMETA WATER TREATMENT PLANT-1, 2, 3 (PERCENTAGE RATE BASIS)( RE-INVITE).
depth for laying of cable below ground / road surface for enclosing cable and back filling the same to make
SPECIAL REPAIR TO DG SETS FOR WATER SUPPLY INSTALLATIONS AGAINST BER AND ALLIED WORKS AT SECTOR B AND SPECIAL REPAIR TO CHEMICAL DOSING SYSTEM FOR SYL FILTRATION PLANT UNDER GE U AMBALA CANTT
Material & labour for sand cushioning with clean dry sand to cables with layer of sand 8 cm before laying of cable and 15 cm thick after laying of cable complete all as specified and directed. Note : For payment purpose punned thickness of 18 cm shall be measured against spread thickness of 23 cm as mentioned in para 19.75 of SSR part-I.