Loading…
Loading…
2,674 results • Best match
RENOVATION OF ELECTRICAL WORKS AT PRATISTHA COMMUNITY HALL IN WARD NO-09 UNDER BR-1
Laying on Wall / surface with Saddles / clamps.(a)Laying of cable upto 2 core 25 sqmm on wall/surface incl. S & F MS saddles with earthing attachment in 10 SWG GI (HOT Dip) Wire, making holes etc. as necy. mending good damages and painting
Electrical general services portion of work in connection with Provision of New pit line at kalaburagi railway station over solapur Division (Re-invitation).
Supply Total 533590.00 Excavation of trench and laying of cable in open yard/along the track/ Platform surface as per Item- 46 specification. S No. Item Description of Item Unit Qty Rate Amount No
Extension of HT line through UG Cable of 50 sq.mm in/c construction of 1X63 KVA pole mounted Sub-Station for providing 3-phase service connection to DTW Scheme
Providing Three Phase Service Connection with laying PVC cable from nearby Electrical pole to Premises upto 35mtr. in length supported by G.I.Wire,Reel Insulator i/c fitting fixing of Energy Meter as required
ELECTRICAL WORKS
Supplying and Laying DWC HDPE pipe as per IS14930 (Part-II) complete with fitting and accessories in ground at the depth of 75cm laying of cable including excavation and refilling the trench etc as required. (OD)/ (ID) 120mm / 103 mm
SITC of Air conditioning machines with allied electrical work at Government College of Nursing, Serampore Walsh SD/SS Hospital, Serampore, Hooghly
Laying of cable from 3/3.5 core 35 sqmm to 50 sqmm on wall/surface incl S & F MS saddles with earthing attachment in 2 x 10 SWG Gl (Hot Dipl Wire, making holes etc. as necy , mending good damages and painting [ 2(C)/F- 1]
Extension/Augmentation of Health Unit along with CC tile paving Infront, CC road and Compound Wall at Adilabad and CHI Office at Washim - Electrical Arrangements.
Cutting of esphated road/ concrete/ cement/under the track etc., and excavation of 37 cable trench 30 cm wide x 90cm deep road etc., for laying of HT/LT UG cable. After laying of cable the trench should be brought to its original position by providing tar/ concrete/ cement as per the site conditions and as per directions of Rly.Engineer.