Loading…
Loading…
2,701 results • Best match
S&T works in connection with "Proposed New Block Station along with development of Goods Shed At Manklav Station."
Laying of S&T Cables of various cores/ pairs/ quads in trenches/ GI pipes/ RCC pipes/ DWC pipes/ Trunking. This also includes laying of cables in track crossings & road crossings. Item includes provision of labels of coloured plastic adhesive tapes or any other identifiable material on 187 each cable to give the cable number at each Gantry Post/hectometer post.(Cables will be meggered before and after its laying by contractor under supervision of Railway Representative and he will submit the meggering report of each testing). Length of the cable laid includes the length of the cable coiled for termination purposes. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution(unit is RM running meter)
UPGRADATION OF WAHROOMS ALONGWITH ASSOCIATED WORKS AND ALTERATION TO STAIRCASE OF BLDG NO. 16/7 AT AF STN CHANDIGARH UNDER GE (AF) CHANDIGARH
M&L for sand cushioning to cables with a layer of sand 8cm deep before laying the cable and 15cm depth after laying & stretching of cable) complete all as specified. Note: Punned thickness overall 18cm shall be measured & paid.
Commissioning of Auto signaling work using MSDAC for continuous track circuiting and Electronic Interlocking work at New Mugma (EI) & Mugma Yard (PI to EI) in between the section Pradhankunta & Mugma (25 km approx) for DEDICATED FREIGHT CORRIDOR work in Asansol Division of Eastern Railway in connection with Sonnagar to Andal Multitracking work .
Breaking of metal/tar road and refilling after laying the cables. Repair of pucca roads to original state in level crossing area after cable laying.
PROVISION OF LOUNGE ROOM AT MAIN GUARD ROOM CHEQUERED TILES AND HARDSTANDING NEAR OFFICERS MESS AT AFTC
Material and labour for Spreading ribbed soil in trenches as in cable cushioning all as per IS 1255-1983, complete all as specified and directed. Note :- (i) Excavated approved soil shall be ribbed by using sieve to separate composite particles etc. as per IS and refilling in trenches before laying of cable 8 CM and 15 CM after laying of cable. This is then gently punned down to a depth of 10 cm above the top of upper most cable (ii) For the purpose of measurement only punned thickness shall be considered for payment.
ADDN ALTN TO BUILDING NO P 26 AT ETI AND PROVN OF MS GATE AND BOUNDARY WALL TO BLDG NO P 300 AT AFDC OF AFS JALAHALLI
Material and labour for Spreading ribbed soil in trenches as in cable cushioning all as per IS 1255-1983, complete all as specified and directed. Note :- (i) Excavated approved soil shall be ribbed by using sieve to separate composite particles etc. as per IS and refilling in trenches before laying of cable 8 CM and 15 CM after laying of cable. This is then gently punned down to a depth of 10 cm above the top of upper most cable (ii) For the purpose of measurement only punned thickness shall be considered for payment.
State Plan UWSS to Mannarkkad phase II Replacing the existing old and damaged AC and PVC distribution pipes in Mannarkkad Municiplaity Supply and erection of 35HP vertical Turbine raw water pump set, shifting of existing house connection to the newl
OD128106/2024-2025:Panel board Panel board (Suitable for operating three pump sets, one pump at a time using castle key interlock) cubical type floor mounted MS fabricated dust and vermin proof common control panel board ) Supply, erection, testing and commissioning of one number suitable capacity MCCB as incomer and three numbers of suitable capacity MCCB as outgoing ( Three MCCBs are interlocking with each other, two will be on at a time) providing suitable size copper bus/ interconnect the above MCCBs and fitted with three numbers of indicator lamps, 1No. volt meter with selector switch, 1 No: Ammeter with selector switch, KW & pf meter etc. complete and provided with a common earth bus for the entire panel and interconnect with the MCCBs as per IE rules and code of practice. The panel shall be fitted on a common base frame on suitable foundation. Capacitor Bank Design, Supply, Installation, Testing & Commissioning of Capacitor Bank ( APP capacitor Panel having suitable capacity power factor compensation for motors - PF to maintain above 0.98), 440 V, required KVAr with externally fused capacitor Units, Dry type Al wound Series reactors, HRC fuse protection, Al Bus bars etccomplete confirming to IS:2834 1986 - 1 no Cable Supplying laying, testing, jointing, and commissioning copper cables minimum 50 sq.mm for the above pump sets from main Panel board to Motor control panel board to the starter and from starter to motor for working individual motors at a time, 35 HP Vertical Turbing pump set to inter link with existing 25 HP starters ( 2 nos. ) as per IE rules, Supply and providing ISI brand single compression cable gland termination for the above cables including cable lug of copper of suitable type and size including brick or CC tray through the floors filled with sand and broken stone and MS vertical trays suitable to the pump room as the directions of departmental officers, all termination should be with copper sockets of required size, Earthing; Supply and providing plate ear thing as per IS 3043 by using suitable cast iron/copper plate with 2.5mtrs. Long 40mm dia class GI watering pipe extended up to middle of plate and clamped to the plate by GI clamps made out of 25x6mm GI strip providing funnel with weld wire mesh. Providing 1 no.earth bus made out of 25x6mm copper strip of 45cm long clamped to the water pipe at top and interconnection of earth bus with CI plate by using 2 nos. suitable copper /GI strip of suitable length, filling charcoal and salt at alternate intervals of 15cm all around plate. Providing masonry earth pit chambers of suitable size and CI chamber cover complete as required as per IS - 1 Lot. Statutory, Approval. Approval from Electrical inspectorate including preparation of drawing obtaining approval for the drawings, arranging inspection of the installation and obtaining safety certificate etc. after completion of the works. Necessary statutory fee if any payable to the electrical inspectorate/KSEB will be paid by KWA (Note: Scheme approval from the Electrical Inspectorate has to be obtained by the firm/ contractor before supplying the equipment) Trial running and commissioning as per KWA rules. Conducting satisfactory trial running of the installation as per the direction of the Engineer in charge after attaining statutory approval and completing the entire work to the satisfaction of departmental officer concerned. Warranty Two years, for all pump sets proposed now and future