Loading…
Loading…
2,706 results • Best match
Extension of HT line through UG Cable of 50 sq.mm in/c construction of 1X63 KVA pole mounted Sub-Station for providing 3-phase service connection to DTW Scheme
Providing Three Phase Service Connection with laying PVC cable from nearby Electrical pole to Premises upto 35mtr. in length supported by G.I.Wire,Reel Insulator i/c fitting fixing of Energy Meter as required
ELECTRICAL WORKS
Supplying and Laying DWC HDPE pipe as per IS14930 (Part-II) complete with fitting and accessories in ground at the depth of 75cm laying of cable including excavation and refilling the trench etc as required. (OD)/ (ID) 120mm / 103 mm
SITC of Air conditioning machines with allied electrical work at Government College of Nursing, Serampore Walsh SD/SS Hospital, Serampore, Hooghly
Laying of cable from 3/3.5 core 35 sqmm to 50 sqmm on wall/surface incl S & F MS saddles with earthing attachment in 2 x 10 SWG Gl (Hot Dipl Wire, making holes etc. as necy , mending good damages and painting [ 2(C)/F- 1]
Extension/Augmentation of Health Unit along with CC tile paving Infront, CC road and Compound Wall at Adilabad and CHI Office at Washim - Electrical Arrangements.
Cutting of esphated road/ concrete/ cement/under the track etc., and excavation of 37 cable trench 30 cm wide x 90cm deep road etc., for laying of HT/LT UG cable. After laying of cable the trench should be brought to its original position by providing tar/ concrete/ cement as per the site conditions and as per directions of Rly.Engineer.
ADDN/ALTN TO HARD STANDING FOR AREA CONNECTING STABLES AT ETT, NDA KHADAWASLA
Excavation in trenches not exc. 1.50 m wide and not exc. 1.50 m in depth for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, laying of cable, erection of poles etc. not exc. 10 Sqm on plan and not exceeding 1.5 m in depth getting out in any type of soil complete all as specified and directed.
Repair maint of DG Sets, AMF panels, earthings and certain EM eqpts and plants including misc EM repairs to installations at AF station jodhpur under 32 Wing and Repair replacement of street light fitting security light fitting, high mast flood lig
supply and laying of Local tibba dry sand cushioning and cover (8 cm thick layer of sand before laying of cable and 15 cm thick layer of sand after laying of cable) for protection of cable, material and labour complete all as specified and as directed by Engineer-in-Charge.