Supply and installation of CCTVs at SPs, SSPs, TSS, TW sheds and TRD Depots
Laying of Telecom cable in PVC pipe/casing Metre capping/conduit pipe along with required accessories Total 33922.60 Excavation of cable trench as per cable route plan, 1 Mtr. deep and of 0.3 Mtr. to 0.6 Mtr wide advised by Engineer-in-charge alongside the track in normal (all type) soil/strata, conforming to distances as per cable route plan and refilling. This work includes clearing of route from bushes etc., covering of cable laid in trench by loose soil for a layer of 50mm thickness approximately Item- 17 before covering by bricks. The work shall be done as per the extant practice on Western Railway and instructions of Railway Engineer at site. In case 1m depth of trench is not achievable due to site conditions, specific approval of JA grade officer will be required for each site where trench depth of 1m is not possible. Without the approval of JA Grade officer, no payment for trenching will be made for trench depth less than 1m S No. Item Description of Item Unit Qty Rate Amount No BHAVNAGAR DIVISION-ELECTRICAL/WESTERN RLY
Hiring of manpower, DG set and LED light fittings in SE and NE ghat section for a period of four months during the monsoon period.
Excavation of cable trench in soil & filling the Metre trench with sand, pebbles etc. after laying of the cable complete with RCC warning cover & cable markers, sand etc. as per railways requirement Total 57559.80 Item- 13 Supply and laying of RCC warning cover as per approved drawing. S No. Item Description of Item Unit Qty Rate Amount No
Construction of Central Park and Rainwater Harvesting System at NTPCBarh STPP.
Laying of PVC cable upto 35 sqmm
PROVN OF 05 X SPLIT AC FOR MI ROOM AND SIG EXCH OF 21 MAHAR UNDER GE (SOUTH) MEERUT CANTT
Excavation in trenches not exceeding 1.5 m wide and not exceeding 1.5 m in depth for foundation, laying of poles / cable in trenches and getting out in hard/dense soil complete all as specified and as directed at site.
Spl Repair to bldg No T-21, T-22 and T-23 at HQ central comd camp under GE(West) Lucknow.
M&L for sand cushioning to UG cables (8 cm deep before laying of cable and 15cm deep over the cable) all as specified and directed
REPAIR REPLACEMENT TO LT DISTRIBUTION SYSTEM SUCH AS SWITCH GEARS, PANELS, AND OTHER ALLIED WORKS AT CENTRAL AREA UNDER AGE E/M-I AT GE (CENTRAL) KHADKI.
Excavation in trenches n.exc 1.5m wide and n.exc 1.5m in depth for laying of Cable/pipe and getting out in soft loose soil complete all as specified and as directed.