Loading…
Loading…
2,800 results • Best match
ADDN / ALTN TO BLDG NO P- 86 AT AF STATION KALAIKUNDA
Excavation in trenches n exc 1.5 wide and n exc 1.5 m in depth for foundation etc or for laying cable etc n exc 10 Sqm on plan and n exc 1.5 m in depth and getting out in soft/loose soil complete all as specified and as directed.
Construction of Hostel Building in KGBV KOLEBIRA in Simdega District South Chotanagpur Division Of Jharkhand
MV cable laying upto 95 sq.mm. in ground - Laying of one number PVC insulated and PVC sheathed/XLPE power cable of 1.1 KV grade of size exceeding 35 sq.mm. but not exceeding 95 sq.mm. direct in ground including excavation, sand cushioning, protective covering and refilling the trench etc. as required.
Construction of Hostel Building in KGBV GUMLA in Gumla District of South Chotanagpur Division of Jharkhand
MV cable laying upto 95 sq.mm. in ground - Laying of one number PVC insulated and PVC sheathed/XLPE power cable of 1.1 KV grade of size exceeding 35 sq.mm. but not exceeding 95 sq.mm. direct in ground including excavation, sand cushioning, protective covering and refilling the trench etc. as required.
ADDN/ ALTN OF S/BY GDCC, DATA CENTRE AND GUARD POSTS FOR IPSS AT AF STN SALUA
Material and labour for sand cushioning for U/G cable 8 cm before laying the cable and 15cm after laying and stretching the cable.complete all as specified and as directed.
Ajmer Division: Provision of UFSBI/Fn-MUX in existing IBS at 4 locations for Strengthening of Signalling Installation and minimize signal events in MD-PNU section over Ajmer Division.
Description:- Excavation of cable trench as per cable route plan, 1.2 Mtr. deep and of 0.3 Mtr. to 0.6 Mtr. wide at bottom as per RDSO sketch No. SDO/CABLE LAYING/003 or latest alongside the track in normal (all type) soil/strata, conforming to distances as per cable route plan and refilling. This work includes clearing of route from bushes etc, covering of cable laid in trench by loose soil for a
SPL REPAIR OF BLDG NO P-97 OF 8 EW AND PROVN OF 300 MTR SECURITY CHAIN FENCING WITH 03 X IRON GATE OF 414 NETWORK SIGNAL COY AT DABATHWA UNDER GE (U) MEERUT CANTT.
Sand cushioning for underground cables 8 cm before laying the cable and 15 cm after laying and streatching the cable, complete all as specified and directed . (Note: Punned thickness shall be measured).