Loading…
Loading…
2,700 results • Best match
CA NO.CWE BLY/GE (W)/38 OF 2026- 2027CONVERSION OF OVERHEAD CONDUCTOR INTO UNDERGROUND CABLE WITH CONNECTED WORKS AT CSD DEPOT BAREILLY UNDER GE (WEST) BAREILLY
M&L for sand cushioning with layer of sand 8 cm thick before laying of cable and 15 cm after lying of calbe in trenches complete all as specified and directed.
COMPREHENSIVE REPAIR/ REPLACEMENT AND DAY TO DAY MAINTENANCE OF HIGH MAST SECURITY LIGHTS/ STREET LIGHTS, JUNCTION BOXES, UG CABLE INCLUDING CONNECTED E/M ITEMS AT WEST OF MALL ROAD EXCEPT MAP UNDER GE (EAST) JALANDHAR CANTT
M&L for sand cushioning with a layer of sand 8 cm thick before laying of cable and 15 cm thick after laying of cable and trenches punned down to thickness of 18 cm complete all as specified and as directed.(Note: Punned thickness of 18 cm will be measured and paid)
CA NO GE (W)/HSR-09/2026-27 SPL REPAIR OF BLDG NO P-559 (19-24) AND PROVN OF HARD STANDING UNDER GE (W) HISAR AT HISAR MIL STN
M&L for sand cushioning with dry coarse sand to under ground cable 23 cm thick, 8cm below the cable and 15 cm thick after laying the cable complete all as specified and directed.
SPECIAL REPAIRS TO BLDG NO T-121 AND 33A AT MIL STN BARABANKI UNDER GE (EAST) LUCKNOW
Supply, laying and testing cable XLPE insulated, screened PVC bedded galvanised steel strip or wire armoured electric power cables (heavy duty) 1100 volts grade with stranded aluminium conductor of size 25 sqmm 4.0 core complete all as specified and directed.
Renovation to EI in Taluka Seva Sadan at Ankleshwar Dist Vadodara
laying cable or locating the fault Paise Fifty
Provision of alternative control office in the JAT division
Preparation of cable way 150mm wide at bottom and 200mm deep in rocky area/CC road/Platform and other CC/Stony location and refilling the same (after telecom Cable laying as well 47 as laying PVC pipe which shall be paid separately under different items of the schedule ) with concrete mixture of proportion 1:3:6 all along the trench done rocky area with contractor's own cement mixture, sand, water and other required materials and restoration of earth work as original with tiles/marvel/Granite etc.This work needs to be done as per Railway Site Engineer.