Loading…
Loading…
2,779 results • Best match
GES/PKT/115/2025-26 ADDN/ ALTN OF SEWAGE SYSTEM AT OTG UNDER GE SOUTH PATHANKOT
Excavation in trenches not exceeding 1.5 mtr wide and not exceeding 1.5 mtrs in depth for laying of cables, pipes etc and getting out in any type of soil complete all as specified and directed.
As per tender document
Excavating in trenches, not exc 1.5 metre wide and not exc 1.5 metre in depth, for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. laying cables, pipes, etc. not exc 10 Sqm on plan & not exc 1.5m in depth and getting out in soft/loose soil complete all as specified and as directed.
COMPREHENSIVE MAINTENANCE AND MANNING, OPERATION FOR SPV SOLAR POWER PLANT OF CAPACITY 4MW AND 2MW AND CONNECTED WORKS AT ARMY AREA JODHPUR UNDER GE (ARMY) NO. 01
Excavation in trenches not exceeding 1.5 m wide and not exceeding 1.5 m in depth for taking out/laying of cables,rerouting of cables, erection of poles, struts/stays, leveling of yard etc not exceeding 10 M² on plan and not exceeding 1.5 m in depth and getting out in soft/loose soil.complete all as specified and directed by Engr-in-Charge.
ADDN ALTN TO BLDG NO. P-183 AT AFSR IMPROVEMENT TO GUARD REST ROOM AT CAMP AREA PROVN OF WALL AT MAIN ENTRANCE GATE AND PROVN OF METAL CHANNEL SHEET BETWEEN IGLOO HUT NO. 2 3 AT AF STN PALAM UNDER GE (AF) PALAM DELHI CANTT - 10
M&L for dry sand cushioning to underground cables with 8cm thick before laying of cables and 15cm thick after laying and stretching of cable complete all as specified and as directed.
Construction of substation at LCA Plant II area of LCA Tejas Division HAL BC
a) All works upto plinth level including necessary openings and packing if any for laying pipes, cables etc. 117.00 Cum 9263.12 Rupees Nine Thousand Two Hundred Sixty Three and Twelve Paise Only 1083785.04
Up-Gradation of CTP Office Rooms including Civil Electrical and Air Conditioning Works at Helicopter Division HAL HC
All works upto plinth level like footing, pedetsal, piles, plinth beam, drains including necessary openings and packing if any for laying pipes, cables, etc.,