Loading…
Loading…
2,754 results • Best match
SPL REPAIR REPLACEMENT OF LT OH LINES UNDERGROUND CABLES AND CONNECTED WORKS INCLUDING REPLACEMENT OF UNSV APFC PANEL AT ITARANA MIL STN
Excavation in trenches n. exc 1.5Mtr width n.exc 1.5 Mtr in depth for laying of cables & foundation of poles, stay assembly and getting out soft/loose soil.
SPECIAL REPAIRS TO DBS ELECTRICAL FITTING AT INS ADYAR AND OLD INS ADYAR AND PROVN OF STREET LIGHTS AND CONNECTED ACCESSORIES AT DARK PATCHES IN NOFRA II MEENABAKKAM UNDER GE NAVY CHENNAI
Excavation in trenches in Soft/loose soil not exceeding 1.5 meter wide and not exceeding 1.5M in depth for laying of cables/pole and getting out of excavated material complete all as specified and directed.
SPL REPAIR TO BLDG NO. T-12 APS-I AREA OF AGE B/R - I UNDER GE (EAST) LUCKNOW
Excavating in trenches, not exceeding 1.5 m wide and not exceeding 1.5 m in depth for laying of cables, pipes etc. and getting out including trimming the sides and forming bottom surfaces to required levels in soft/loose soil complete all as specified & directed by Engr-in-Charge.
PROVN OF INFRA FOR INSTALLATION OF 240 KW ELECTRIC FAST CHARGING STATION ALONGWITH CONNECTED FITTINGS FOR ELECTRIC VEHS AT AAD CENTRE UNDER GE (I) GOS
Excavation in trenches , not exceeding 1.5 mtr wide and not exc 1.5 mtr depth for laying of cables, pipe lines, protection pipes and foundations etc and getting out in soft /loose soil complete all as specified and directed.
SPECIAL REPAIRS REPLACEMENT OF STREET LIGHT UG CABLE IN CERTAIN LOCATIONS AND SEARCH LIGHTS AT NWTS AVADI AND REPLACEMENT OF EXISTING LIGHTS WITH SPARK PROOF LIGHTS IN BATTERY CHARGING ROOMS AT TS AVADI UNDER GE NAVY CHENNAI
Excavation in trenches in any type of soil not exceeding 1.5 meter wide and not exceeding 1.5M in depth for laying of cables/pole and getting out of excavated material complete all as specified and directed.
PROVN OF ONE SMALL ROOM FOR AKASH WPN SYS IN MRSAM COMPLEX AAD COLLEGE UNDER GE (I) GOS
Excavation in trenches not exceeding 1.5 mtr wide and not exc 1.5 mtr depth for laying of cables, pipe lines, protection pipes and foundations etc and getting out in soft loose soil complete all as specified and directed.