Loading…
Loading…
2,768 results • Best match
PROVN OF INFRA FOR INSTALLATION OF 240 KW ELECTRIC FAST CHARGING STATION ALONGWITH CONNECTED FITTINGS FOR ELECTRIC VEHS AT AAD CENTRE UNDER GE (I) GOS
Excavation in trenches , not exceeding 1.5 mtr wide and not exc 1.5 mtr depth for laying of cables, pipe lines, protection pipes and foundations etc and getting out in soft /loose soil complete all as specified and directed.
SPECIAL REPAIRS REPLACEMENT OF STREET LIGHT UG CABLE IN CERTAIN LOCATIONS AND SEARCH LIGHTS AT NWTS AVADI AND REPLACEMENT OF EXISTING LIGHTS WITH SPARK PROOF LIGHTS IN BATTERY CHARGING ROOMS AT TS AVADI UNDER GE NAVY CHENNAI
Excavation in trenches in any type of soil not exceeding 1.5 meter wide and not exceeding 1.5M in depth for laying of cables/pole and getting out of excavated material complete all as specified and directed.
PROVN OF ONE SMALL ROOM FOR AKASH WPN SYS IN MRSAM COMPLEX AAD COLLEGE UNDER GE (I) GOS
Excavation in trenches not exceeding 1.5 mtr wide and not exc 1.5 mtr depth for laying of cables, pipe lines, protection pipes and foundations etc and getting out in soft loose soil complete all as specified and directed.
Medical Services-Nurse Calling System for D Block Hospital, Silvassa, DNH.(2nd Call)
Supply, Installation, Testing and Commisoning of Nurse Call Communication Cabling : Laying of 25mm Conduit and Nurse Call Communication Cable with Wall Chiseling from each Nurse Call Point to the respective Nurse Station. 1
PROVN OF HT SUPPLY FROM WT 05 TO WT 08 AT SITE II RAJPURA UNDER GE AF AMBALA
Excavation in trenches, not exc 1.5 metre in depth for foundation, laying pipes/cables etc. or for shafts, wells, cesspits, manholes, pier holes, etc. and getting out, in soft/loose type of soil complete all as specified & directed.
REPAIR/ MAINTENANCE OF FIRE ALARM AND GAS SUPPRESSION SYSTEM INSTALLED AT VARIOUS TECHNICAL BUILDING/HANGERS OF AFS YELAHANKA
Excavation in trenches not exceeding 1.5 m wide and not exceeding 1.5 m deep for laying of cables, pipes, foundation for poles etc., and getting out in hard/dense soil complete all as specified and directed.