Loading…
Loading…
2,839 results • Best match
Construction of Skill Lab at Academy Building Under Kolkata Medical College and Hospital..---(Part II)... A.C Installation Work
E. Laying of cables :---
Augmentation
Releasing and re errection of existing 1000sqmm UG cables (During laying of new cables if required)
SPECIAL REPAIRS TO BLDG NO T-28, T-194/B, T-197/B, T-9/DC, T-15/BD, T-63/D, T-82/D, T-127/BD, P-31, T-199, P-10/45, P-10/47 AND P-10/48 URINAL /SENTARY ANNEXE/TOILET/BTH AND BLOCK OF WC/LATRINES OF JRC UNDER AGE B/R- II OF GE (WEST) BAREILLY.
Supply and laying & testing UG cable XLPE Insulated, screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (Heavy duty) 1100 Volts grade with stranded aluminium conductor of size 10 sq mm, 2 core. complete all as specified and directed.
LODHIKHEDA WATER SUPPLY SCHEME TAH- WARORA
Item No. 17- Making trenches of suitable width and 0.7 m deep and laying provided L.T. cable and refilling the same with screened sand bed of 0.2 m thickto embedded the cable and bricks placed on both sideslength wise and top width wise all over the run and refilling the excavated earth without shine or hard material and making the surface proper with 0.15 m crown on the top
Electrical General work in Connection with "ABSS: At Aluabari Road Jn. - Provision of Approach Road and Improvement of Circulating Area at 2nd Entry".
ground level for laying of cable & refilling the soil
Modification and Alteration of XRay rooms at Joynagar Kultali RH Kultali block in the district of South 24 Parganas Electrical Works.
Laying of cable upto 3/4 core 25 sqmm on wall/surface incl. S & F MS saddles with earthing attachment in 10 SWG GI (Hot Dip) Wire, making holes etc. as necy. mending good damages and painting