Loading…
Loading…
2,579 results • Best match
PROVISION OF ROOF TOP SOLAR PANEL 40 KW AT BLDG NO. P-57 (VINTAGE-2004), ELECTRICAL LAB AT CQAV UNDER GE (S) AHILYANAGAR
Supply, Laying , jointing and testing of LT underground cable, 3.5 core 150 sqmm, heavy duty, 1100 Volts, XLPE insulated and sheathed, armoured with multi-stranded aluminium conductor cable , laid in trenches/ducts or fixed to poles/walls or laid under roads/paths/drains/culverts duly encased in galvanised iron pipe of suitable sizes including cable gland of suitable sizes and aluminium lugs for connection complete all as specified and directed of following size:-
INCREASING CAPACITY OF 33by11 KV SS TAMBOUR (FROM 1X5plus1X8TO 2X5plus1X8 MVA), 33by11KV SS BISWAN (RURAL) (FROM 2X10TO 2X10plus1X5 MVA) and 33by11 KV SS NAIPALAPUR (FROM 1X10 plus1X5 TO 2X10 MVA) AT DISTT SITAPUR
Laying & dressing of 11KV 3x300 Sq.mm U/G cable Double Ckt. from 5MVA T/F to 11KV incoming Switchgear by excavation of earth in the trench 450mm wide, 900mm deep providing 150mm fine sand cushion below the cable. The cable shall be duly protected by bricks, sand & stone slab and refilling & ramming of the left out soil. Spare cable shall be left and buried in the trench in the shape of rings at both ends. Cable laying work includes unrolling, cutting, making ring and sealing both ends of the cable. (All decentralized/consumable materials to be provided by Contractor Expect Cable).
Electrical work in c/w "Improvement of passenger amenities by providing HVLS fan, Air circulating, exhaust fan, DG set with other ancillary work etc. over MLDT Division."
14 14 Cable trenching, laying as per IS-1255, 1983 or Metre 1000.00 236.94 236940.00
Electrical work for "Rewiring of staff quarters with latest scale of fittings along with Copper wiring for 2nd phase in Colony area PLW/PTA
Excavation of trench under soft soil minimum 1 meter deep & 400 mm wide for laying of PVC/XLPE aluminium armoured cables of all sizes as per site requirement and provide sand 16 cushioning of 75 mm thick layer around the cable and top protection with class B bricks, (the sand, bricksetc are in the scope of the tenderer). The trench to refilled back after laying of cable, ramming, levelling and watering the excavated area after laying of cable to bring the surface to original level as per technical specifications and site requirements.
Work of LT Line Strengthening and Bifurcation of 11 KV Line under Business Plan 2026-27 in the Area of EUDD-11 KV and LT Line, South-Madhavpuram, Meerut.
Laying of 11 KV XLPE cable Underground in trench of different size as per site requirement including binding etc.
PROVN OF 01X 2000 KVA POWER TRANSFORMERS INCLUDING ASSOCIATE EM AND BR INFRA AT MRS DANAPUR CANTT
M&L Sand cushioning with dry local sand for cable protecting underground cable (8 cm before laying the cable and 15 cm after laying the cable) in trenches including punning the sand upto 18 cm thick and consolidated complete all as specified and directed. NOTE: Punned thickness only shall be measured.