Loading…
Loading…
2,427 results • Best match
REPAIRING AND REPLACEMENT OF UTTARAN LIGHTING ARRANGEMENT AT DIFFERENT UTTARAN AREAS IN WARD NO - 47
Laying on Wall / surface with Saddles / clamps.(a)Laying of cable upto 2 core 25 sqmm on wall/surface incl. S & F MS saddles with earthing attachment in 10 SWG GI (HOT Dip) Wire, making holes etc. as necy. mending good damages and painting
Business Plan 2026-27 work at GHANTAGHAR Sub Station under EDD-I, Bahraich
Erection work Minium depth of laying from ground surface to the top of cable as per IS is- i) Low Voltage (1.1 KV) and Control Cable - 0.75 Mtr. ii) 3.3 KV to 11 KV Cables - 0.90 Mtr. iii) 22 KV to 33 KV Cables - 1.05 Mtr. iv) Cables at Road Crossing - 1.00 Mtr. v) Cables at railway level crossings (measured from bottom - 1.00 Mtr. of sleepers to the top of Pipe) Note 1) - The depth may be increased but not more than 1.6 M 2)- The standard depth and width for laying the cable are also attached (as per letter No. 561/Director(Tech.)/MVVNL/Camp/Dt. 09-01-26 561with the tender form.
i) Electrical work in c/w "Construction of subway in lieu of LC gate no 8/spl at Km 286/5-6 in bet stn GGA-LLM in SBG-BGP section of Malda Division." ii) Electrical work in c/w "Construction of Subway in lieu of LC gate no 2A at Km 314/9-315/0 bet stn NAT-AKN in BGP-JMP section of Malda Division." iii) Electrical work in c/w "Construction of subway in lieu of LC gate no 2 at Km 316/7-8 in bet stn NAT-AKN in BGP-JMP section of Malda Division." iv) Electrical work in c/w "Construction of subway in lieu of LC gate no 7 at Km 325.636 in bet stn AKN-SGG in BGP-JMP section of Malda Division." v) Electrical work in c/w "Construction of subway in lieu of LC gate no 11 at Km 331.629 in bet stn SGG-GNNA in BGP-JMP section of Malda Division." vi) Electrical work in c/w "Construction of subway in lieu of LC gate no 16 at Km 351/8-9 in RPUR yard in BGP-JMP section of Malda Division." vii) Electrical work in c/w "Construction of subway in lieu of LC gate no 16/spl at Km 361/6-7 in bet stn JMP-DRTP in BGP-JMP section of Malda Division." viii) Electrical work in c/w "Construction of subway in lieu of LC gate no 17/spl at Km 362/7-8 in bet stn JMP- DRTP in JMP-KEU section of Malda Division." ix) Electrical work in c/w "Construction of subway in lieu of LC gate no 23 at Km 377/9-378/0 in bet stn MSDN-AHA in JMP- KEU section of Malda Division." x) Electrical work in c/w "Construction of subway in lieu of LC gate no 26 at Km 382/6-7 in bet stn AHA-KJH in JMP-KEU section of Malda Division." xi) Electrical work in c/w "Construction of subway in lieu of LC gate no 27/spl at Km 386/4-5 in bet stn AHA-KJH in JMP-KEU section of Malda Division." xii) Electrical work in c/w "Construction of subway in lieu of LC gate no 34/spl at Km 400/0-1 in bet stn DNRE-KEU in JMP-KEU section of Malda Division." xiii) Electrical work in c/w "Construction of subway in lieu of LC gate no 29 at Km 41/14-15 in bet stn BHLB-PJLE in BGP-MDLE section of Malda Division."
38 38 Cable trenching, laying, back filling & Connection Metre 450.00 252.94 113823.00
Electrical works
Laying/sagging of HDPE PIPE 160MM DIA PE-80 PN-6 for laying of XLPE Cable 3X300mm. trenchless HDD Method proper completion of work as per requirement of site at various site complete in all respect as per respo norms.
Design, Supply, Erection, Testing & Commissioning of Railway Electrification Work of 2x25 kV AC OHE Traction System along with Boundary Sectioning Posts (BSPs), Sub-Sectioning Posts (SSPs) between Sahjanwa (Excl.) to Bansgaon (Incl.) section in connection with Sahjanwa - Dohrighat new BG line project in N.E. Railway of Lucknow Division
Laying of LT cable of required size in Metre open air/along the Pole/ wall /Pucca trench/DWC Pipe with clamping arrangement. Cable laying work shall be governed by IS:1255/1983.(Cable will be supplied by Railway) Total 2820830.81 Item- 04 Non SOR-4: Anti Theft Charging S No. Item No Description of Item Unit Qty Rate Amount
Work for lifting up Feeder pillar boxes and repair / repairment of broken feeder pillar box of broken feeder Pillar boxes of AA-I, at Newtown, Kolkata, Under NKDA area.
Laying of one cables above 35 sqmm and upto 185 sqmm in an underground trench in single tier formation (horizontal), the trench size : 460 mm x 760 mm average depth, with brick protection on the top of each cable 8 (eight) Nos. bricks per Mtr. and between the bricks and cables and also trench to be filled up with shifted soil, levelling up and restoring surface duly rammed