Loading…
Loading…
2,427 results • Best match
Provision of DC Track circuit for dual detection (Kyosan make EI) in various station yards of Kharagpur division.
1000.00 pushing method (also called moling) at minimum depth of 1.5 meter below the formation level of earth as per decision of Engineer in charge. Boring diameter should be atleast 110mm. The ground level shall be considered ignoring the bank height of the bank of the road. Note: DWC/HDPE/GI Pipe Supply is covered under this item. Contactor shall provide all material required for work and adequate nos. of labours for proper laying of cables into the bore. Cable shall be laid cautiously so that it should not get damage due to rough handling & pressure on cable. Payment of boring shall be made only after laying of the cables into DWC/HDPE/GI pipe. KHARAGPUR DIVISION-S AND T/SOUTH EASTERN RLY HDD: In case of short stretches (less than 100 m in single stretch). Micro Tunnelling through Horizontal directional drilling (HDD) machine, preparation of sites, boring and laying of HDPE pipes of size (Outer/Inner diameter= 50mm/42mm) for crossing of S&T cable through HDPE pipe at bridges/culverts/track crossing/pucca road crossing. Boring trench shall be minimum 3 (three) meter below the surface/river bed and minimum 1 m at track/road/pucca road crossing area etc. This includes supply of permanently lubricated HDPE telecom ducts of equal length as per Specification No. RDSO/SPN/TC/45/2013 REVISION 2.0 with latest amendments. For each HDPE duct the following items are to be supplied as per requirement (a) End plug, (b) Cable sealing plugs, (c) Plastic coupler slip fit/push fit type & (d) End plugs to be provided along with drum. In case the site doesn't allow to perform as per schedule, written approval must be obtained from at least site incharge officer. Note: The boring profile should be recorded and submitted for verification of depth and length of boring.
Provision of DC Track circuit for dual detection (Medha make EI) in various station yards of Kharagpur division.
750.00 pushing method (also called moling) at minimum depth of 1.5 meter below the formation level of earth as per decision of Engineer in charge. Boring diameter should be atleast 110mm. The ground level shall be considered ignoring the bank height of the bank of the road. Note: DWC/HDPE/GI Pipe Supply is covered under this item. Contactor shall provide all material required for work and adequate nos. of labours for proper laying of cables into the bore. Cable shall be laid cautiously so that it should not get damage due to rough handling & pressure on cable. Payment of boring shall be made only after laying of the cables into DWC/HDPE/GI pipe. KHARAGPUR DIVISION-S AND T/SOUTH EASTERN RLY HDD: In case of short stretches (less than 100 m in single stretch). Micro Tunnelling through Horizontal directional drilling (HDD) machine, preparation of sites, boring and laying of HDPE pipes of size (Outer/Inner diameter= 50mm/42mm) for crossing of S&T cable through HDPE pipe at bridges/culverts/track crossing/pucca road crossing. Boring trench shall be minimum 3 (three) meter below the surface/river bed and minimum 1 m at track/road/pucca road crossing area etc. This includes supply of permanently lubricated HDPE telecom ducts of equal length as per Specification No. RDSO/SPN/TC/45/2013 REVISION 2.0 with latest amendments. For each HDPE duct the following items are to be supplied as per requirement (a) End plug, (b) Cable sealing plugs, (c) Plastic coupler slip fit/push fit type & (d) End plugs to be provided along with drum. In case the site doesn't allow to perform as per schedule, written approval must be obtained from at least site incharge officer. Note: The boring profile should be recorded and submitted for verification of depth and length of boring.
CERTAIN ELECTRICAL PROVISION WORKS AT NSRY JARAWA VIJAYA BAUGH UNDER GE HADDO SRI VIJAYA PURAM
Supply, laying and testing cable XLPE Insulated ,screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 25 sqmm 4.0 core complete all as specified and as directed.
06/EWC(G)/2026-27
Laying & dressing of 11 KV, 3x300 Sq.mm XLPE Cable underground from 5 MVAT/F to 11 KV incoming switchgear in the trench 450mm wide, 900mm deep, providing 150mm fine sand cushion bench and 150mm fine sand cushion above the cable. The cable shall be duly protected by 1st class bricks two either side and third on top of the cables. The cable shall be duly protected by 1st class bricks two either side and third on top of the cables, laid in series one after the other, the work includes supplying of fine sand and bricks, refilling and ramming of the left out soil, closing the trench and leveling. Spare cable shall be left and buried in the trench in the safe of rings at both ends. Cable laying work includes unrolling, cutting, meggering and sealing both end of the cable.Supply & fixing of double compression brass cable gland with all accessories including earthing tag, shroud, complete termination, testing & commissioning as per IS/IEC standards.
PROVISION OF CHECK LOCK FOR DEFLOODING AT VARIOUS LOCATION AT NOFRA UNDER GE (NW) NOFRA
Excavation in trenches not exceeding 1.5 m wide and not exceeding 1.5 m in depth and taking out soft/loose soil for laying of cable /Laying of pipe/evection of pole/stay pit excavation eomplete all as specified and directed by Engr in Charge.
AC Works for Upgradation of GCA Building
ELECTRICAL CABLE/ CONTROL CABLE: Supply and laying of power/ control cable o size as recommended by OEM from IDU to ODU suitable for above supplied 11TR inverter type ductable AC unit. Make: Finolex/ Polycab/ Gloster