Loading…
Loading…
2,463 results • Best match
REPAIR AND MAINTENANCE OF LT CONDUCTORS WITH CONNECTED WKS PERTAINING TO PRE AND POST MONSOON AT AREA-I AND II UNDER GE SAUGOR
M&L for supply and laying sand cushioning with local dry and clean sand over and under the cable for protection of cable , 80 mm thick before laying the cable and after laying the cable complete all as specified and directed. Note:- Only punned thickness of 180mm shall be measured for payment.
Proposed Construction of (G Plus 2) storied 50 Bedded Critical Care Block at Barasat Government Medical College and Hospital, North 24 Parganas District -- External E.I. Work (Sub-station Work and Compound Light).
SUB HEAD 4 -- SUPPLY & LAYING HT/ LT CABLES: Supplying and laying of HT Cable, 11KV(E) Grade stranded aluminum conductors, XLPE insulation, semiconducting screening, and aluminum armouring for mechanical protection and PVC/FR PVC outer sheathing in combination with copper tape etc. [Make: Gloster/Polycab/Havells/RR Kable] (IS 7098 Part - 2/2011 with Up To Date Amendments.) 3 core 240 sqmm
SPECIAL REPAIR, ADDITIONS AND ALTERATIONS FOR MOC DEVELOPMENT CENTRE AT DEFENCE LABORATORY JODHPUR
Supply, laying & testing cable XLPE insulated, screened PVC bedded , galvanised steel strip or wire armoured, electric power cable (heavy duty) with stranded aluminium conductor, 11000 volts, earthed grade cross sectional area 300 Sqmm. 3 core completed all as specified and directed.
Provision of Double /Second Distant signalling arrangement in KSARA-TITOLI section(18Km section) consisting of North East Ghats in Kalyan-Titoli section(A Route) of Mumbai Division & Provision of balance indoor & outdoor signalling works in connection with Electronic interlocked station at Titoli station on HDN route of Mumbai division, where Kavach is sanctioned.
Excavation of cable trench as per cable route plan, 1.0 mt. deep and 300mm wide along side the track in normal soil/strata, conforming to distances as per cable route plan and refilling after cable laying. This work includes covering of cable laid to trench by loose soil for a layer 30 of 50mm thickness after clearing of route, bushes etc. It shall be ensured that top of the cables laid is at a depth of 0.8 m or more. If it is less, then the width and depth shall be suitably increased and accordingly proportionate payment shall be made. In case depth of trench is not achievable due to site conditions, proportionate payment will be made as per procedure. The work shall be done as per extant practice on C.Rly & the instruction of Railway engineer at site. Drg No SK 805
Development and upgradation of old Heritage Bungalow No. 13, repair and renovation of the Patient Relative Rest House, and upgradation of the Squash Court at North Colony and Garden Reach, South Eastern Railway, under ADEN/Settlement/GRC.
Laying of cable underground: Excavation and Metre Digging of cable trench in any kind of soil along the Road/Path, across the Road/Path if feasible, as per exact field requirement, generally as per CEE/GRC's drawing No.CEE/G/A-3/P-134 (MOD.-1), however width and depth of the trench shall be as per critical field requirement and as advised by Railway for all kinds of soil. The cost also includes Brick boxing and laying of cable (cable will be supplied by Rly.) in cable trench along the Road/Path, across the Road/Path if feasible, as per field requirement as per IS 1255(1983), refilling of the trench by sand and soil with re-dressing of the Road/Path way etc. as like original, providing cable route marker embossing SSE/EL/P/GRC with date of laying at suitable intervals and termination of cable to the switch gears, pillar box, DB etc by suitable gland/socket/lugs/ Bimetallic lugs etc. as per site requirements. The contractor shall supply good quality bricks & sand.
Upgradation and development work from Mulayam Tiraha on 60 ft road situated between Janakipuram I and Janakipuram III ward in Zone-3 Upgradation and development work from Classic turn Pappu Store to Neera Nursing Home etc CMGRIDS
33 KV 3*300 SOMM CABLE LAYING IN CONSTRUCTED TRENCH S/C INCLUDING THE OPENING THE TRENCH COVER WITH THE HELP OF HYDRA & AFTER LAYING CLOSING THE TRENCH COVER PROPERLY