Loading…
Loading…
2,438 results • Best match
ARC for Erection and maintenance of HT, LT & TC at Panigate S.DN and any other SDNs under VISHWAMITRI EAST Division office
(i) Contractor must have experience of Laying of HT/EHT/LT underground Power cable
Howrah Division- Signalling work in connection with- Schedule A1-SIGNALLING cost for Proposal for extension of existing FOB towards western side at Nalhati station under Sr. DEN/4/HWH. Schedule A2-Telecom cost for Proposal for extension of existing FOB towards western side at Nalhati station under Sr. DEN/4/HWH.
Laying of S&T Cables of various cores/ pairs/ quads in trenches/ GI pipes/ RCC pipes/ DWC pipes/ Trunking. This also includes laying of cables in track crossings & road crossings. Item includes provision of labels of coloured plastic adhesive tapes or any other identifiable material on each cable to give the cable number at each Gantry Post/hectometre post.(Cables will be meggered before and after its laying by contractor under supervision of Railway Representative and he will submit the meggering report of each testing). Length of the cable laid includes the length of the cable coiled for termination purposes. Above/
Provision of IP based Integrated Passenger Information Systems (CIB, TIB, AGDB, True Colour MLDB, Auto Announcment Systems) at 10 Stations.
Cutting of concrete platform to a depth of Metre 200 mm and width of 100 mm to lay DATA cable and power cable through DWC pipe of 63/50 mm dia, Contractor has to redress the cutting place into its original position without destroying the beauty after cable laying, This includes pedestal cutting and redress into its original position after cable laying wherever required, This includes supply of DWC pipe of 63/50 mm dia, IS: 14930, Pt.-II mark. Inspection of all materials will be done by consignee before use.
Providing, Laying and Shifting of power line at Industrial area Udaipur Khurd, amounting to Rs. 469.04 lakh
Add Extra in item no. 11.1 to 11.4 for Laying Charges for cable through Vermeer machine by making pit at regular interval and repairing the pit after laying of cable with PCC/ Bitumin as required.
AUGMENTATION OF ELECTRIC SUPPLY SYSTEM AND ALLIED WORKS AT GE AF MC CHANDIGARH
Excavation in trenches, n.exc 1.5 m wide and n.exc 1.5 m depth and getting out in any type of strata for locating fault, laying of cable and pipe or taking out old u/s cable complete including taking out & stacking of old bricks/pipes, etc and making good to the disturbed surface complete all as specified and directed.
CONSTRUCTION OF NEW 33 KV LINE FOR 33/11 KV SUBSTATION SAITAPATTI FROM 132 KV SUBSTATION ZAMANIA DISTT. GHAZIPUR ON SEMI TURNKEY BASIS.
Excavation and preparation of standard size cable trench for laying of 33 kV, 3×300 sqmm XLPE cable, including dressing and leveling of trench bottom, providing fine sand cushioning minimum 75 mm before the laying of cable (providing temporary barricading, caution boards and necessary safety arrangements during execution of work shall be arranged by the contractor ).