Loading…
Loading…
7,622 results • Best match
Renovation Work at Moti Mahal Shreenathji mandir, Nathdwara.
Providing and applying superior quality emulsion for wall painting with Velvet touch/Royal paint etc of approved brand and manufacture to give an even shade with putty and preparation of surface applying with the help of paint roller the work complete in all respect as per direction of Engineer-in charge. New Work Three or More coat
Renovation of CMD Chamber at NALCO Bhavan Bhubaneswar
Project N0-221/26-Renovation of Kunnam GLPS
12.48:Providing & fixing on roof pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work complete (steel frame work to be paid separately)
Repair and renovation of Repeater Station at Sabari.
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Repair/ Renovation of Guest House at Nigeen Club.
Providing, fixing and applying Plaster of Paris (POP) false ceiling consisting of frame work made with 50mm sq M.S. tubes of 18 G thickness as main runner at 600 mm c/c both ways,... also including applying a coat of red oxide zinc chromate primer over the M.S. frame work and suspenders complete. Including providing and fixing expanded metal of size 5.25 mm ...
Renovation of office of coordinator(NSS) MDU Rohtak
[6.34.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending,... length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, ...