Loading…
Loading…
8,541 results • Best match
REPAIR/RENOVATION OF BATHROOM TILING, SANITARY FITTINGS AND REPAIRS TO SUNKEN FLOOR/WALL OF CERTAIN BATH WC AND MISC WK BY NON-DESTRUCTIVE METHOD AND REPAIR/REPLACEMENT OF SERVICE WATER TANK INCLUDING CLEANING AND CERTAIN MISC ITEMS AT CME UNDER GE
... floors and walls of bath, WC, WHB and urinals (combined unit) with using non destructive construction chemical methods such as hydrophobic PU grouting, Epoxy coating etc including cleaning... including cleaning of surface with wire brush and detecting the sources of leakages and repairing surfaces all as per manufacturers instructions & directed. NOTE : The rate is inclusive ...
M/o STP (Existing STP based on SBR Technology core Parts (Decanter core part, diffuser, PLC SCADA and Related work) (Renovation and Strengthening work of the existing 33 MLD STP Core Parts with MPS at Sector-54) Noida (PART-C)
... Turbo Blowers as a stand by arrangement Capacity - 4800 Nm3/h @0.60 Kg/cm2 & all complete work as above items. direction by Engineer-in-charge b) Replacement of Twin Lobe Blower with ...
M/o STP (Existing STP based on SBR Technology core Parts (Decanter core part, diffuser, PLC SCADA and Related work) (Renovation and Strengthening work of the existing 50 MLD STP Core Parts with MPS at Sector-168) Noida (PART-A)
... Turbo Blowers as a stand by arrangement Capacity - 4900 Nm3/h @0.60 Kg/cm2 & all complete work as above items. direction by Engineer-in-charge b) Replacement of Twin Lobe Blower with ...
M/o STP (Existing STP based on SBR Technology core Parts (Decanter core part, diffuser, PLC SCADA and Related work) (Renovation and Strengthening work of the existing 35 MLD STP Core Parts with MPS at Sector-123) Noida (PART-D),
... Turbo Blowers as a stand by arrangement Capacity - 5100 Nm3/h @0.60 Kg/cm2 & all complete work as above items. direction by Engineer-in-charge b) Replacement of Twin Lobe Blower with ...
M/o STP (Existing STP based on SBR Technology core Parts (Decanter core part, diffuser, PLC SCADA and Related work) (Renovation and Strengthening work of the existing 25 MLD STP Core Parts with MPS at Sector-50) Noida (PART-B)
... Turbo Blowers as a stand by arrangement Capacity - 4200 Nm3/h @0.60 Kg/cm2 & all complete work as above items. direction by Engineer-in-charge b) Replacement of Twin Lobe Blower with ...
Repairing and renovation of RWS Bangalow, Guard Room, Computer Room, Generator Room, Office of the Superintending Engineer and Construction of Toilet for Guard and Driver and other ancillary work at RWS campus under Malda Division, PHE Dte. in the Di
Constructing Inspection pit of inside measurement 600mm X 600mm X upto 600mm (depth) with 250 mm thick 1st. class brick work in cement mortar (1:4) on all sides, bottom of the pit consisting of 100 mm thick cement ...