Loading…
Loading…
8,223 results • Best match
Deposit-Central Prison and correctional home,Poojappura-Construction of a building for Yoga Hall Phase 2-Civil work
OD9123/2026-2027:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. .All work above plinth level upto floor V level
Renovation of Control room building, Construction of Feeder Cable Trench, WBM Road, Maintenance ancillary civil work at 66kV Maroli SS Dist. Navsari under Navsari Circle.
Repair of plaster, painting and other misc. civil works in office/Control Room Building at 220 KV S/S Panki, Kanpur. (P.R. No. 1300075525/2026)
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (Code no. 10.2)
GENERAL Urgent rectification and water proofing works to the roof slab of Academic block in Govt Polytechnic college Neyyattinkara Special repairs General Civil Work
14.1.1:Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand)
CIVIL WORKS
Rigid and smooth centering and shuttering for R.C.C. work including false works and dismantling after casting – Foundation & Plinth Beam
CIVIL WORKS
Rigid and smooth centering and shuttering for R.C.C. work including false works and dismantling after casting – Foundation & Plinth Beam