29,817 results • Best match
Balance work of Agreement No.520 for the year 2020 21 Laying Jointing and Testing of DI Pipe in sewer network 300 mm dia 365 Rmt 250 mm dia 100 Rmt 200 mm dia 250 Rmt and 150 mm dia 700 Rmt C/O Manhole Chamber 37 Nos C/O RCC Pillar 20 Nos C/O Pl
The work shall be executed as per HPIPH specifications, CPHEEO manual with latest amendments on sewerage and sewage treatment, relevant IS codes and to the entire specification of the Engineer-in-Charge.
Balance work of Agreement No 520 for the year 2020 21 C/O RCC Retaining Wall PCC Wall 68.20 Rmt Providing and Laying DI Y connection class K7 jointed with S.B.R Tyton Push on joint of 150mm dia from ITI Mandi to Panchvaktra Bridge
The work shall be executed as per HPIPH specifications, CPHEEO manual with latest amendments on sewerage and sewage treatment, relevant IS codes and to the entire specification of the Engineer-in-Charge.
Balance work of Agreement No 520 for the year 2020 21 C/O RCC Retaining Wall 41.40 Rmt PCC Wall 29.67 Rmt Providing and laying DI Y connection class K7 jointed with S.B.R. Tyton Push on joint of 150 mm dia from Janchu Ka Naun to Shiva Bawari
The work shall be executed as per HPIPH specifications, CPHEEO manual with latest amendments on sewerage and sewage treatment, relevant IS codes and to the entire specification of the Engineer-in-Charge.
Balance work of Agreement No 520 for the year 2020 21 Laying Jointing and Testing of DI Pipe in sewer network 300 mm dia 737 Rmt 250 mm dia 200 Rmt C/O Manhole Chamber 37 Nos C/O RCC Pillar 25 Nos C/O Platform 20 Nos C/O RCC Retaining Wall
The work shall be executed as per HPIPH specifications, CPHEEO manual with latest amendments on sewerage and sewage treatment, relevant IS codes and to the entire specification of the Engineer-in-Charge.
Balance work of Agreement No 520 for the year 2020 21 Laying Jointing and Testing of DI Pipe in sewer network 200 mm dia 500 Rmt 150 mm dia 1000 Rmt C/O Manhole Chamber 38 Nos C/O RCC Pillar 15 Nos C/O Platform 20 Nos C/O RCC Retaining Wall
The work shall be executed as per HPIPH specifications, CPHEEO manual with latest amendments on sewerage and sewage treatment, relevant IS codes and to the entire specification of the Engineer-in-Charge.
Balance work of Agreement No 520 for the year 2020 21 Laying Jointing and Testing of DI Pipe in sewer network 300 mm dia 365 Rmt 250 mm dia 100 Rmt 200 mm dia 250 Rmt and 150 mm dia 300 Rmt C/O Manhole Chamber 37 Nos C/O RCC Pillar 20 Nos C/O Pl
Excavation in foundation and trenches etc. in earth work lift upto 1.50 metre stacking the excavated soil not more than 3 metre clear from the edge of the excavation and then returing the stacked soil in 15 cm layer, when required in to plinth sides of foundations e tc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed in all leads and lifts of 20 metres complete in all respect.and to the entire satisfaction of the Engineer-in-Charge.