Loading…
Loading…
10,955 results • Best match
Provision of MSDAC at DNA, LAU & SBR stations in section of DSTE/ MTD of JU division.
... quads in trenches/ GI pipes/ RCC Metre pipes/ DWC pipes/ Trunking. This also includes laying of cables in track crossings & road crossings. Item includes provision of labels of coloured plastic ...
Provision of MSDAC at BGKT station in section of DSTE/ JU of JU division.
... quads in trenches/ GI pipes/ RCC Metre pipes/ DWC pipes/ Trunking. This also includes laying of cables in track crossings & road crossings. Item includes provision of labels of coloured plastic ...
PROVISION OF FILTERATION PLANT FOR BORE WELLS AND ADDITION ALTERATION OF FRESH WATER SYSTEM AT WET BASIN AND REFIT JETTY NSRY SVP UNDER GE HADDO, SRI VIJAYA PURAM
Supply, laying and testing cable XLPE Insulated ,screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 95 sq mm 3.5 core complete all as specified and as directed.
SPL REPAIR TO BLDG NO P-88 AT MIL STN BHUJ UNDER GE (A) BHUJ
Material and labour for earthing complete with GI earth plate electrode 600x600x6 mm thick burried directly in ground... strip 32x6 mm by mean of bolts, nuts, check nuts and washer of brash all as shown in electrical plate No 3 connected to earthing test point all as specified or indicated including PCC pit and CI cover fullel with watering ...
SPECIAL REPAIR OF AC SHEETING OF 30 X OR LIVING BLDGS OF 126 TA BN UNDER GE (WEST) PATHANKOT
M&L for earthing complete with galvanised steel earth plate electrode , 600 x600 x 6mm thick burried directly... suitable handle of 6mm dia MS bar and angle iron 40x40x3mm frame for cover including earth work in any type of soil , removal of surplus soil to a distance n.exc 50m and connecting ...
Rajkot Division-Signalling work in connection with Engg work of (i)TTR(TWS+WCMSC) 21 sets (ii)RJT-OKHA- CTR(P)-4.190 Tkm & TRR(P)-25.155Tkm (iii)JAM-KNLS Section: CTR(P) From Kms.848.886 to 850.700 Total 1.814 Kms (iv)Viramgam - Rajkot, Wankaner - Navlakhi & Surendranagar - Botad- CTR(P)- 4.013 Tkm, TRR(P)-8.982 Tkm and TSR(P)-50.74 Tkm(v) Kanalus: Rectification of bad layout from Pt 112 towards PBR side by shifting the turnout manually by 18m towards RJT.
Laying of S&T Cables of various cores/ pairs/ quads in trenches/ GI pipes/ RCC pipes/ DWC pipes/ Trunking. This also includes laying of cables in track crossings & road crossings. Item 16 includes provision of labels of coloured ...