Loading…
Loading…
11,274 results • Best match
Interlocking of four numbers of engineering manned level crossing Gates with TVU >50,000 at Katihar division
All works of Excavation of cable trench 1.0 M deep, 0.3 mtr wide on pucca platform/Pucca Road and placing of GI pipe, and restoration of the platform /Road surface to the original condition after cable laying and refilling the trench. Necessary materials e.g. GI pipe, 85 cement, sand, stone chips, ...
Repair to external water supply pipe line and connected items at South Camp, West Camp, North Camp and East Camp under AGE (I) MFFR
Excavating in trenches, not exc 1.5 metre wide and not exc 1.5 metre in depth, for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. laying cables, pipes, etc. not exc 10 Sqm on plan & not exc 1.5m in depth and getting out in soft/loose soil complete all as specified and as directed.
IMPROVEMENTS AND REDEVELOPMENT OF HEALTH CITY LAYOUT IN ARCHAKARAHALLI UNDER RAMANAGAR URBAN DEVELOPMENT AUTHORITY
Supply and delivery at site best indigenous brand new power capacitor as per IS 2834/1986 with latest amendments with KPTCL authorities and erection, electrification and commissioning of the same at t...
Provision of Telecom facility in connection with ORH and offices at Badhwar Park, GLO Building & Station Building CCG of Mumbai Division.
Installation, testing & commissioning of Indicators including laying of cables in casing capping as per specification no.4.54 of chapter 4 of tender document.
ADDN/ ALTN TO TOILET AND BATHROOM NEAR EXISTING BLDG NO T-3 AT 14 INF DIV PRO UNIT UNDER GE CLEMENT TOWN
M & L for fine dry sand cushioning for underground cable by providing layers of sand 8 cm before laying and 15 cm deep after laying the cable including streching the cable ( measurement to be taken after punning down consolidated thick ness ). complete all as specified and as directed .
MTC OF IE WORKS AT GONDATWISA PWD DIVISION OFFICE, CHAMBER OF AE(P) AND THE CHAMBER OF THE SDO, PWD (R AND B) GONDATWISA, DHALAI TRIPURA
Providing and fixing of 3 pin 6/10 amps plug point with modular type 6/10 amps switch and socket including connection with 2x1.5 sq. mm PVC insulated Copper conductor cable (FR) on surface modular switch board, earthing the 3rd pin etc. as required:-(As per TSR 2021, Sl- 203)