Shifting of 33KV line for construction of Road Over Bridge at Somavaram Railway Crossing Gate, KM 1 4-6 of Narasingabilli to Kondakarla Road LC No 477 of SouthCentral Railway in Somavaram Village of Kasimkota Mandal in favour of Deputy Executive Engineer R & B, Yelamanchili in Thallapalem Section of Aganampudi Sub Division of Operation Division Kasimkota in Operation circle Anakapalli
ELECTRICAL WORKS UNDER BUSINESS PLAN 2025-26 IN JURISDICTION OF EDD UNCHAHAR
Laying and Jointing PVC Pipe. Heading
General Electrical Work
1.10.3:Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed medium class PVC conduit, with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm. FRLS PVC insulated copper conductor single core cable etc as required.Group C
SITC of additional Air Conditioner machine with allied Electrical works at Academic Bldg Auditorium in the campus of IPGME and RSSKM Hospital, Kolkata-20(Electrical Work)-SITC of Air-Conditioning System at Green Room cum VVIP rest room.
Supply & Laying of 4 Core 2.5sq. mm. XLPE Insulated & unarmoured stranded Copper Conductor control cables having following numbers of core for Working Voltage up to 1100 Volts of following sizes] (As Control Cable from ODU to IDU) (Make : Havells/Gloster/KEI/Polycab)
Construction (Civil and Electrical ) of a new two pump fire station (Gplus1 storied building with foundation of G plus3 storied building ) at Manbazar in Purulia District--- External Electrical Installation Works
Laying of cable upto 2 core 25 sqmm on wall/surface incl. S & F MS saddles with earthing attachment in 10 SWG GI (Hot Dip) Wire, making holes etc. as necy. mending good damages and painting
Miscellaneous Electrical maintenance works
Liaison with the Electricity DISCOMs for taking shutdown of LT/MV lines for checking, testing and shifting of Energy Meter/ Meter box/Feeder panel etc. and re energization of power supply after completion of electrical works etc. complete as required.