Loading…
Loading…
10,055 results • Best match
Repair/replacement including day to day maintenance of internal electric components including wiring, submain, VTPN DBs, light fittings and allied works in OTM Accn of 226 ASC,1811 Pioneer, ESD, 21 MC Group units under GE(West) Delhi Cantt-10
M&L in replacement of earthing complete with galvanised steel earth plate 600X600X6 mm thick buried directly in ground (earth pit not les than 2.25 M deep below GL with top edge of plate not less than 1.50 m below GL) connected with GI earth lead wire 4.0 mm as earthing leads by means of bolts, nuts, check nuts and washers all joints as shown on drawings and including excavation, earth work. GI pipe light grade 15 mm bore for protection of GI earth wire from earth electrode to and including the earth test point, supplying and laying charcoal dust, common salt PCC (1:2:4) type B1 chamber and MS angle iron frame of 40mmx40mm x3 mmand RCC cover 40 mm thick (1:2:4) type B1 using 20 mm graded stone aggregate reinforced with 8 mm dia TMT bars @ 75 mm C/C both ways with MS handle 12 mm dia, PGI funnel and wire mesh, 20 mm dia GI pipe light grade for watering all as shown in electrical plate No 3 of SSR Part -I and conected to earth test point including testing complete all as secified and directed at site.
Construction of 11 KV line and Installation of Transformers for providing Electric Connection to MDDA Dhaulas Housing Scheme under EDSD, Mohanpur under EDD, Mohanpur.
Chemical Earthing:Earthing of distribution transformer including digging of pit of size 2.5 Mtr depth and make hole of size 150 mm. Placing of earthing electrode (to be supplied by contractor as per drawing No. A) as drawing B, connecting the same with G.I. Strip (to be supplied by contractor ) of size 35x6 mm as per drawing C for a minimum lenght 6 m. treatment of soil with highly condctive substance as per IS 30343 complete in all respect, result of earthing resistance to be recroded in M.B. before and after installation of earthing. The earth resistance after earthing should be less than 1 Ohm.
Work contract for conversion of exg OH lines into UG Cable at 11 KV Girivala path of Tiruvannamalai EDC
Erection of 6 Way pillar box including excavation of foundation pits as per standard specification 2 Nos pillar concrete walls, coping and earthing the pillars below ground level 3 feet from ground level including cost of all materials, cost of labours including electrical works, transportation, lead, lift complete etc.,
as per SBD
Repair and maintenance of 11 No. gates of CHEP-III by way of dismantling and cleaning of all parts by using petrol, dhoti cloth, brush etc. Applying fresh coat of grease to all the parts of gate and then assemble it properly. Oiling to chain sprocket arrangement and rollers which includes shaft, lock pin, roller, etc. Repair of damaged Chain block at head work if required. Replacement of gear oil in reduction gearbox, damaged/worn out brake pads, Stainless steel nuts & bolts for seals and repair of motor if required. Removal of old cadmium compound / grease from the steel wire rope, cleaning it properly and then applying fresh coat of cadmium compound. Cleaning of sill beam. Replacement of damaged/burnt out contactors switches, fuses, indicatorsetc. The job also includes complete dismantling of winch machine of manually operated gates which include pinion, gear, gun metal bushes, etc. and cleaning of all parts by using petrol, dhoti cloth, brush etc. Applying fresh coat of grease to all the parts of winch machine of the manually operated gates and then assemble it properly. Oiling to rollers which includes shaft, lock pin, roller, etc. removal of old grease from the threaded stem rod, cleaning it properly and then applying fresh coat of grease. cleaning of sill beam. Welding of broken /damaged parts if any .Checking the manual as well as electric operation of the gates by lifting and lowering it 2-3 times.
a)Removal of cables from the existing junction boxes,further identification of cables as per the drawing and putting tags.b)Dismantling of existing defective junction boxes from its location and installation of new junction boxes,entry of cables with ... with cable glands ... of cables in ... the cables from ... newly installed junction ... the work shall ...
Supply and installation of junction boxes and Laying of Cables from ESP hoppers, MCC, Compressor Room and Slurry pump house to PLC at Units-5,6,7&8 AHP