Loading…
Loading…
9,752 results • Best match
Please refers to BOQ
... free standing floor mounted dust and vermin proof compartmentalized cubical panel for electrical Works, made out of CRCA sheet. Other parameters required as per point (a) Thickness of sheet... shall be of 2.0 mm thick sheet supported by base M.S. channel if required. Side walls and cable alley compartment shaving bolted type doors with/without detachable extension type structure ...
Construction of Gaurav Museum Phase-II at Distt. Gorakhpur
... Pump(01set) -Sump Pump (01set) -Plant/Interconnecting Piping And Valves -Manual/PLC Based Electrical Control Panel -Incoming/Outgoing Feeder -Cable Laying With Cable Tray -Earthing Systems
Construction of 1 unit of 40849 Sqft size PEB -Industrial Warehouse with internal roads, MEP Services and Ancillary Buildings at CW Madhavaram, Chennai (TN).
... development including clearances, levelling, earthwork, sub-structure and super-structure works, internal and external finishes, plumbing and sanitary works, electrical installations, waterproofing, drainage, testing and commissioning, all in accordance with CPWD Specifications ...
PROVN OF URC INFRASTRUCTURE ALONGWITH ASSOCIATED WORK AT 15 BRD UNDER GE AF CHILODA
Lump sum price worked out for INTERNAL ELECTRIFICATION as listed in Sch 'A’ Part IV.
Labour Contract for Carpentry, Polishing and Packing of Teakwood Tables and Wooden Cupboards of various sizes
... hinges, tower bolt, lock, nylon wheel with brake, edge band, , 6" SS handle and Supply and laying 2.5 sq mm wire x 3core for inter connection with suitable plug top, fixing of SooPii 60W 6-Port Charging Station for Multiple Devices, PD 20W USB C Fast Charging items and electrical work with good carpentry finish.)
Replacement of Damaged Power Transformer on time to time Under EUDD-33 KV STD./EXP./YEIDA NOIDA
Neat Welding of all the earthing strip of newly installed 05 MVA/08 MVA Power Transformer by proper overlapping and making connection of all cables / conductor of HV/LV side, control cables of Tranformer at various 33/11 KV substaion and 2 providing assistance in testing. New earthing strip if required for proper completion of work shall be provided by the contractor.