Construction work of double circuit 11 KV line from 33/11 KV substation ITI (newly constructed) to R.T.O office and gas Godown under EDD Rural Haldwani.
FABRICATION OF STEEL
Stringing of 2nd circuit line
Steel Fabrication: Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/w...
Replacement of damaged platform at Juice heater area Labour Contract
Dismantling of damaged Platforms at juice heater area. Fabrication and Erection of Juice heater area out of 6mm MS chequered plate. Fabrication and Erection of base frame, Tie frame and platform supporting base Channel. Providing of handrails and ladders wherever necessary. The Approximate weight of the contract work will be around 12.00 MT approximate NOTE: before quote rivew the scope of work and terms and conditions
Construction of Arch Gate and Providing Cut Stone Flooring to Sri Gowreswara Swamy Temple, Gowravaram (V), Kavali (M), SPSR Nellore District (AP), Est.Cost Rs.40.00 Lakhs
VRCC (1: 1 1/2 : 3) using 20mm HBG Metal including cost and conveyance of cement and all other materials to work spot labour charges curing etc., complete but excluding cost and conveyance of steel and its fabrication charges etc., A) For Footings
Construction of R.C.C Roof Building for Dining hall at Apara karmala Satram in Srinivasarao Pet Burial Ground in Div No. 22
Supply and placing of the M20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including tremmy pumping,laying concrete,curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work.
Providing Compound Wall and Shed to the Community Hall at R&B Vambay Colony in 45th division of RMC.
VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding Seigniorage charges on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work including centering, shuttering, cost and conveyance of all materials and all labour charges etc., complete as per ss and as directed by the site engineer (Footings )