Loading…
Loading…
6,132 results • Best match
Replacement of Old Evaporator 4th Body Vapour Catchall
Specifications: Replacement of Old Evaporator 4th Body Vapour Catchall Size: Outer cell Dia : 2500mm Height : 2750mm Thickness : 12 mm Cone Outer dia : 2500mm Height : 1500mm Thickness : 12 mm Scope of work: 1) Dismantle the existing damaged vapour line in the Old Evaporator 4th body vapour catchall, weighed and leading to scrap yard through our mill stores. 2) Fabrication and erection of new vapour line as per the existing manner welding on both sides (2 layer). 3) The approximate quantity of work will be around 3.00 MT. 4) Hydro test is to be carried out to check the leakages.
Installation of 25 H.P. mudpump with all fitting accessories for unit no - 01 AND 02 at swarnjayanti vihaar S.P.S.
Labour charges for fitting / Fabrication Work of 150 mm dia M.S. pipe and 300 mm dia D.I. pipe with welding charges installation of 25 H.P. mudpump with lowering
Repairing of 01 No. Drive Head C7 belt discharge drum and 02 Nos. Steam Feeder Jack Shaft Assembly and 01 No. Slack Feeder Jack Shaft Assembly of Rajnagar RO CHP Mine of Rajnagar RO Sub Area
Fabrication / Repairing of Bearing Base & Housing
Modification of Chlorine Filter Units in IR-DRDO BIO-Digester tanks of LHB Coaches based at Coaching Depot Thiruvananthapuram North (CD/TVCN) for a period of Three months
Removal, Fabrication & Fitment Works for Modification of Chlorine Filter Units in the IR-DRDO BIO-Digester tanks of LHB Coaches (Rate inclusive of cost of materials)
Modification of Chlorine Filter Units in IR-DRDO BIO-Digester tanks of LHB Coaches based at Coaching Depot Nagercoil (CD/NCJ) for a period of Three months
Removal, Fabrication & Fitment Works for Modification of Chlorine Filter Units in the IR-DRDO BIO-Digester tanks of LHB Coaches (Rate inclusive of cost of materials)
Modification of Chlorine Filter Units in IR-DRDO BIO-Digester tanks of LHB Coaches based at Coaching Depot Ernakulam (ERMCD) for a period of Three months
Removal, Fabrication & Fitment Works for Modification of Chlorine Filter Units in the IR-DRDO BIO-Digester tanks of LHB Coaches (Rate inclusive of cost of materials)