6,156 results • Best match
Construction of Primary Health Centre building at Arasada (V), Vangara (M) in Vizianagaram District
Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) Footings
Annual Maintenance Shutdown of Wheel Shop Equipments for 2026-27 (MWFPS) - Group 4 - Sand Plant, RT-14&15, Draw Furnace, Hot Wheel Line Turn Tables and WFPS Grinding Stations.
1. Removal of all pneumatic cylinders. 06 Nos. 2. Removal of work rotator assembly, UT bridge assembly, Kicker & stopper assembly. 01 set 3. Removal of Guide rollers, wheel runway, wheel clamping assembly. 01 set 4. Service & Fitment of work rotators assemblies by replacing defective bearings & plumber blocks. Fitment of flanges and glands to ensure leak proof tanks 1 set 5. Fabrication & fitment of spare motor mounting base and align with work rotator sprocket 01 set 6 Fabrication and fitment of kicker cylinder mounting base 01 set 7. Fabrication and fitment of stopper 1 cylinder mounting base 01 set 8. Fabrication and fitment of lowerator cylinder mounting base 02 set 9. Fabrication and fitment of bridge cylinder mounting base 01 set 10. Repair & fitment of wheel run way, UT bridge, Kicker & stopper assembly and ensure alignment with entry & exit side conveyors. 01 set 11. Repair & fitment of wheel clamping assembly. 01 set 12. Service & fitment of guide rollers. Replacement of guide rails and main rails 01 set 13. Replacement of defective water & pneumatic pipelines & hoses. 01 set 14. Fitment of all pneumatic cylinders & replacement of damaged hoses, valves and fittings. 06 Nos. 15. Paint with one coat of red oxide and Two coat of apple green paint after thorough cleaning. 01 set 16. Disposal of released materials and dispose it to the earmarked area. 01 MT
CONSTRUCTION OF LNG SATELLITE STATION WITH LNG DISPENSING FACILITY AT BADAPOKHARIA, TANGI -KHORDA, CUTTACK (PART-A), NASIRABAD, RAJASTHAN (PART-B), RAMAYAMPET, MEDAK TELANGANA (PART-C) AND ARPL, PUNE- AHILYANAGR, MAHARASHTRA (PART-D)
Canopy in Structural Steel Supply, fabrication, erection and handing over of structural steel fabricated canopy [steel structures tentative weight @ 85 Kg/Sqm] with 0.6mm thick Zincalume/galvalume colour coated steel sheets for roof sheeting as per specification, including 0.6mm thk. cold rolled colour coated steel profile sheet of Trac (150F) Pre-Coated Steel false ceiling system, with powder coated finishes as per manufacturers instruction and specification, facia, flashings, Rain Water Pipe, electrical cable pipe & Gutter, including surface preparation by mechanical cleaning including application of one coat of Zinc phosphate primer of DFT 35 microns at shop, second coat of Zinc phosphate primer of DFT 35 microns at site after erection and two coats of finishing paint of synthetic enamel of DFT 25 microns each per coat at site (Total DFT 120 microns). The work is to be completed in all respect as per technical specification of Canopy, scope of work, detailed construction drawings and directions of the Engineer-in-charge. (rectangular plan area shall be considered for measurement) 1. The tentative weight of structural steel shall be 85 kg/m2 (only weight of Steel structures elements excluding sheeting and false ceiling) of canopy area. A variation of +/- 15% of structural steel weight shall be deemed included in the item. Any increase/decrease beyond this limit shall attract payment/deduction @ Rs. 80000/- per Tonne. 2. Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as structural steel, purlins, nuts, bolts, washers, screws, seals, wire ropes, roof sheeting, flashing, fitting and fixtures, false ceiling system, gutter, rain water pipes, electrical cable pipe and bends, electrodes, edge colour coated sheets (for signage works), primer, paint and all consumables etc. with all bye works and sundry works complete in all respect. 3. Rate to exclude cost of electrical wiring for under lights and Signage works, supply & fixing of all electrical fixtures/materials, signage works & Civil Foundation.
3 Construction of MCV Protecting shed at different location Lalbazar Kolkata police the year 2026 27
M.S. structural works with hollow sections (square or rectangular shape) conforming to IS: 806-1968 & IS:1161-1998) connected to one another with bracket, gusset, cleat as per design, drawing & direction of Engineer-in-Charge complete including cutting to requisite shape & size, fabrication including metal arc welding conforming to IS: 816-1969 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of all M.S. Hollow section, all consumables such as electrodes, gas and hire charges of all tools and plants and labour reqired for execution and all incidental chages (such as electricity, labour insurance) etc. complete. Payment to be made on the basis of calculated weight of structural memebrs of MS Holow Section as specified in relevent IS code in finished work. Payment for gusset, bracket, cleat may be made by adding the actual weight of such items with weight of finished structural members. The rates are considered for a hight of erection 8 m. / 2nd floor level from the ground. Add 1.5 % extra over the rate for each additional floor or 4m. beyond the initial 8 m. or part thereof.
Providing, Installation, Testing and Commissioning of Submersible Pump set having specifications 5000 GPH X 60 Mtrs head along with allied works at T/well Ganesh Nagar under JMC Capex (New Works) 2026-27.
Providing, installation, testing and commissioning of submersible pumpset having specifications 5000 GPH x 60 M Head along with allied works at tube well Ganesh Nagar. Shifting of the new submersible pump sets from place of storing to workshop. Fabrication and fitting of U-shaped tie rod / clamp which is to be fabricated out of MS flat and to be fitted with submersible pump by fabrication and fitting of bolts and nuts which are to be welded on both sides of the clamp. The job also includes fabrication of expander / reducer nipple for NRV of required size which is to be fabricated out of MS/GI pipe threaded at one end and flanged at the other end. Fitting of reducer /expander nipple to be fastened with column pipe at one end with flange joint and with the discharge outlet (NRV) of the submersible pump at the other end. Coupling of submersible pump-set and testing it in testing pit at workshop and shifting to site of work. Installation, testing and commissioning of submersible pump set extracting of already lowered pump set along with worn out submersible cable and column pipes. Providing and fitting of 16 mm sq. submersible cable 40 Mtrs in length for replacing worn out submersible cable. Making of connections of submersible cable with motor leads and lowering of submersible pump set. Job also includes P/F of 100 Amp Main switch on the wall and Making of all connections with main switch and LT control panel and then testing the pump set. Job also includes electrification of tubewell room by way of Providing / Fitting of LED lights 50 W - 3 nos. to side walls of the pump room building having individual and independent OFF/ON switches arrangement. Job also includes 5 Ton Manual chain pulley and hang on girder with the help of sling. The job includes cost of submersible pump sets, lowering of submersible pump set, submersible cable, materials i.e. tie rod, expander, reducer, nipple, nuts, bolts, rubber sheets, main switch, manual chain pulley and labour charges. Complete Job.
Annual Plan-Ponnani BP 2025-26- Electrification of motor shed-at Kanthallur Padasekharam Vattamkulam GP
90.14.1.2:Fabrication, supply, conveyance, installation testing and commissioning of floor or wall mounting, dust and vermin proof, cubicle type MV panel board comprising of the following components/ devices & complying to IS 8623. Fabrication of fully partitioned, dust and vermin proof enclosure for panel assembly as per form 4 of IS 8623 (with latest amendments) using CRCA sheet as per approved design and requirement, with front and rear access facility, bus bar chambers, hinged doors for all switch gear compartments, earthing the doors using 4 sq mm braided copper conductor, providing necessary cut-outs for mounting meters, relays, indication lamps, bus bar interconnection etc, detachable covers for bus bar chamber and cable alley, powder coating the assembly after subjecting to 7 tank process etc as required. CRCA sheet alone be used for the fabrication. Angles/ flats/ slotted angles etc shall not be used for the fabrication of panel assembly. The measurments will be taken the area of the complete sheets used for panel board including partitions, folding, shrouding etc.Supply and fabrication of MV panel board using 1.6mm CRCA sheet, powder coated (excluding base frame)