Loading…
Loading…
6,464 results • Best match
DEPOSIT-Construction of Pump House Lift Irrigation Station Number 1 - Electrification - Peruvelichal east Puncha, Nooranad LI-1- General Electrical Work
90.14.1.2:Fabrication, supply, conveyance, installation testing and commissioning of floor or wall mounting, dust and vermin proof, cubicle type MV panel board comprising of the following components/ devices & complying to IS 8623. Fabrication of fully partitioned, dust and vermin proof enclosure for panel assembly as per form 4 of IS 8623 (with latest amendments) using CRCA sheet as per approved design and requirement, with front and rear access facility, bus bar chambers, hinged doors for all switch gear compartments, earthing the doors using 4 sq mm braided copper conductor, providing necessary cut-outs for mounting meters, relays, indication lamps, bus bar interconnection etc, detachable covers for bus bar chamber and cable alley, powder coating the assembly after subjecting to 7 tank process etc as required. CRCA sheet alone be used for the fabrication. Angles/ flats/ slotted angles etc shall not be used for the fabrication of panel assembly. The measurments will be taken the area of the complete sheets used for panel board including partitions, folding, shrouding etc.Supply and fabrication of MV panel board using 1.6mm CRCA sheet, powder coated (excluding base frame)
Establishing 2x20 MVA, 110/11kV sub-station at Rajeev Grama and Construction of 110kV DC Line from existing 110/33/11kV Shiggaon sub-station to proposed 110/11kV Rajeev Grama sub-station using Panther conductor for a distance of about 9.874kms near Konanakeri Village along with Construction of 110kV Terminal Bays at existing 110/33/11kV Shiggaon sub-station in Shiggaon Taluk & Haveri District.
B18 Steel Fabrication: Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures kg 100656.90 2330.81 102987.71
Work of Supply, laying, testing and commissioning of 11KV /22 KV UG cable (XLPE cable will be supplied by DGVCL) with cable termination and straight through joints kits (to be supplied by contractor) for laying Underground Cable in all Schemes at Dindoli, Godadara, Udhana (R), Devadh & Limbayat S/dn under Pandesara Division under Pandesara Division. if required at other Sub division Under Pandesara Division
connection arrangement along with fitting of necessary fabrication for 11KV cable
Wheel Shop Annual Shutdown 2026, Work No. 6 (MMR).
1. Dismantling and removal of pusher beam, hydraulic cylinder & pusher beam support rollers of MPO 1, 2 & 3. 2. Removal of both charge and discharge doors of MPO 1, 2 & 3. 3. Removal of RC fan assemblies of MPO 1, 2 & 3. 4. Removal of hot air duct of MPO- 2 (Approximately 20 meters ) 5. Fabrication of new hot air duct of MPO- 2 (Approximately 20 meters ) 6. Removal of defective side wall panels of MPO-2 and carrying out repairs to the same. 7. Repair of the side wall panels, top wall panels, support channels, ducts, and heating element bank structures of MPO-1, 2 & 3. 8. Repair of the damaged portion of ducts of MPO - 1 & 3 9. Fitment of hot air duct of MPO-2 & strengthening its support. ( Approximately 20 meters ) 10. Repair and allignment of pusher beam support structures of MPO 1, 2 & 3. 11. Servicing and fitment of RC Fan assemblies of MPO 1,2 & 3 ( Impeller and shaft has to be dynamically balanced. ) 12. Replacement of pusher beam support rollers and bearings of MPO 1, 2 & 3. 13. Replacement of damaged pusher beam dogs, pins and positioning on the support rollers of MPO 1, 2 & 3. 14. Fitment of serviced pusher beam cylinder and connection of hydraulic lines of MPO 1, 2 & 3. & check for any hydraulic leakages. 15. Repair to charge and discharge door guides and strengthening of the guide supports and side structures of MPO 1, 2 & 3. 16. Fitment of charge and discharge doors of MPO 1, 2 & 3. 17. Replacement of defective drive & driven sprocket, chain and gear box of charge and discharge doors of MPO 1, 2 & 3 18. Painting of all MPOs with one coat of heat resistant aluminum paint. 19. Disposal of released material to earmarked place. 20. Supervisory charges 21. Balancing charge for R.C fan assembly of MPO( Qty - 3 Nos )
Tender for providing and conversion of the existing 11 kV Single Circuit to Double Circuit from the Dam site to the CT Gate of 126 MW Larji Power House under the Resident Engineer, Larji Power House Division HPSEBL, Thalout Mandi
Supply of MS Angle Iron 50x50x6 mm Length 1800 mm: Fabrication and supply of members made of only TATA/SAIL/RASHTRIYA ISPAT M.S. Angle Iron 50x50x6 mm, suitable for fixing on Steel double pole structure of 11KV structures with holes at suitable places wherever required to adjust 5/8” dia nuts and bolts. The weight of MS Angle Iron should be 4.5 Kg per meter with a variation of +/-5%. The member should be duly painted with two coat red oxide paint of superior quality:
Establishing 2x20MVA, 110/11 kV substation at Nittur and construction of 110kV LILO line using Lynx conductor from on going 110kV Tiluvalli-Hunsabhavi SC line to proposed 110/11kV Nittur substation for a distance of 5.013km in Hirekerur Taluk, Haveri District
B17 Steel Fabrication: Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures kg 68074.51