Loading…
Loading…
6,386 results • Best match
Creation of estimating section and also some finishing work at the office area of the Superintending Engineer Kolkata Electrical Circle at 2nd floor of KIT Building P16 India Exchange Place Extension Kol 73 during the year 2026 27
Labour charge for fabrication and installation of composite door, window, partitions made from annodized extruded alloy aluminium sections for the following units:- (D) Partly glazed and partly panelled partition or fixed glazing made of extruded and anodised alloy aluminium sections, fabrications after cutting to proper shape and size etc. I) For partitions using section of size: a) 63.50 mm x 38.10 mm
As per NIT/SBD
Design, Soil Investigation, Load Testing and Design vetting from competent authority i.e. NIT/IIT/DIQC for Construction of 48mtr Span Steel Truss Foot Bridge (Through Type) at Sohal Paddar over river Chenab including construction of Approaches on both sides, Supply, Fabrication, Launching , flooring with 6mm thick chequerred plates, railing, Priming of steel members, its painting with good quality Synthetic Enamel paint ,width of bridge 1.8 mtr including all leads and lifts carriage and all other allied works complete in all respects as per the direction of Engineer in-charge (complete job in all respects) (Under SASCI) (EPC Mode)
Selection of Implementation Partner for balance work at IOCL terminal/Depot/BP namely Haldwani and Shahjahanpur for the project Design, Supply, Installation, Testing, Commissioning and CAMC of IP Based CCTV Surveillance System along with associated w
Design, fabrication, painting & erection of Structural steel (MS) for erection of cable bridge (if required) for laying of above ground cables at road crossing or any other place within the Terminal including painting, Civil foundations, nuts, bolts, washers, cleats, stiffeners, gussets, base plate etc
HARDOI ROAD BASANTKUNJ YOJNA ANTARGAT SECTOR I AND SECTOR J KI VIDHUT AAPURTI HETU BANE 33/11 KV UPKENDRA KI ENTERLINKING KA KARYA
Supply/fabrication and Erection of 33 KV Double Pole Cable Exposure D/C complete with 410SP-55 11 mtr long ST Pole-2 Nos, 33 kv pin insulator with pin and nut-9 nos, top channel 100x50 mm, MS angle 65x65x6mm, LT XLPE cab le AL. 1x400sqmm-18mtr, danger board with clamp-2 nos, barbed wire, pole fencing-2 nos, aluminium lug- 12 nos, holding MS clamps-12 nos, nut bolts etc icluding painting of pole with aluminium paint over red oxide primer all complete direction of E/Ic. as per UPPCL specification
Erection of 01 Nos 132KV Enerbosta Solar Bay at 132 KV Kadaura Substation under ETD Orai
Erection of Main & auxiliary structure consisting of columns, beams, peaks, masts etc. and auxiliary structure required for installation of isolators, C.Ts. P.Ts. L.As. and all other equipments. The job consists of shifting of all material i.e. structure parts, nuts, bolts, washers etc. from store to site of erection, erection of structure as per relevant drawing and practices using flat and spring washer with each bolt. Matching of holes, cutting, fabrication of members if required shall also be done by the contractor without any extra cost to complete the work satisfactorily. All material to be erected shall be supplied by UPPTCL free of cost but all men, material and T&P required for satisfactorily completion of work shall be arranged by the contractor at his own cost.
Providing Installation and commissioning of High wall Split WindowCassetteFloor mounted Split type Air Conditioning system as and when urgently required in different areas AGMC GBP Hospital for 01 year period
Fabrication of M.S platform for placement of condensing unit by using M.S angle of (65x65x5) or (50x50x5) mm size base plate, nuts and bolts/ universal bracket (GSS) for ODU of split type ACs including all accessories for onsite installation i/c painting, fitting, fixing, grouting by cement mixture as per direction of the Engineer-in-charge.