Loading…
Loading…
6,263 results • Best match
Protective Coating Metallizing & Painting, replacement of of footpath, corroded/loose rivets of Steel girder bridges on BSL-KNW Section of BSL Division.
Supply, fabrication and erection of steel members to replace existing corroded members of built up section made up of MS plate, angles, channels of different thickness and sizes including painting with one coat of ready mix paint Zinc Chromate priming to IS:104 followed by one coat of ready mix paint red-oxide Zinc Chrome priming paint to IS:2074. Structural steel should 3 conform to IS:2062 E250- Grade'B0'. Fabrication and erection to be as per existing design initially by bolts and nuts and finally by rivetting during the sanctioned traffic block. Rate includes cutting of new steel work, removal of rivets by drilling, dismantling of any existing members required for inserting fabricated members, fixing of new fabricated built up members with all tools, plants, labour, consumables, machinery and accessories etc. Work will be executed as per IRS:B 1-2001. Note: Painting shall be paid extra under relevant item.
Structural repairs and replacement of corroded/loose rivets & other steel members and painting of track girder bridges in various section(CSMT-CLA, CLA-TMBY, TNA- VSH) of Mumbai division.(09 bridges)
Supply, fabrication and erection of steel members to replace existing corroded members of built up section made up of MS plate, angles, channels of different thickness and sizes including painting with one coat of ready mix paint Zinc Chromate priming to IS:104 followed by one coat of ready mix paint red-oxide Zinc Chrome priming paint to IS:2074. Structural steel should 1 conform to IS:2062 E250- Grade'B0'. Fabrication and erection to be as per existing design initially by bolts and nuts and finally by rivetting during the sanctioned traffic block. Rate includes cutting of new steel work, removal of rivets by drilling, dismantling of any existing members required for inserting fabricated members, fixing of new fabricated built up members with all tools, plants, labour, consumables, machinery and accessories etc. Work will be executed as per IRS:B 1-2001. Note: Painting shall be paid extra under relevant item.
Replacement of UPS & provision of solar water heaters at various locations in BSL division.
Supply, fabrication, fixing and erection of MS Work of miscellaneous size and for cable tray etc.
Permanent restoration of Singanna Kunta, Singaram(V), Inavole(M) Hanumakonda District
OT Sluice Gate: Fabrication, supply, erection, testing and commissioning of Skin plate,Horizontal and vertical angles , stiffeners, rubber seals ,clamps with all accessories for sluice shutters including cost of all materials, machinery, labour, seal fixing etc complete as per specification of drawings and approved drawings (Excluding wastage of steel@2.5%)
Augmentation of Water Supply Scheme Chatterhama by way of construction of Additional Bore Well.
Supplying, assembling, subsequent lowering and fixing in vertical position in above bore using ODEX method by double layer welding, ERW FE 410 M.S plain, bevel ended casing pipe of 200 mm dia. Having wall thickness not less than 6.40 mm and conforming to IS: 4270. The casing pipes supplied should be of reputed and approved make supported with manufacturers latest test certificate including painting of outside surface with two coats of anticorrosive paint and required hire & labour charges, fitting and accessories, all complete for all depths. The job includes Fabrication, flushing of holes in the pipes as per strata of the bore.
Construction of PCC retaining wall at ittery road south side 3rd part in Ward No 91, South Zone.
Cement Concrete 1:2:4, one part of cement, two parts of sand , four parts of 20 mm hard blue granite metal by volume, characteristic strength not less than 20 N/sqmm) machine mixed for all reinforced Cement Concrete works, including scaffolding, cost of all materials, machine mixing, vibrating, lifting, curing, labour charges for laying & finishing etc., but excluding the cost and fabrication of reinforcements and also excluding centering and formwork etc., complete complying with the relevant standard specifications at all leads inside the building.