Ward number 42 green city Phase 1 mein Sant Bhavan ke samne park ka Soundaryakarn ka karya
P/F of M.S Grill work with fabrication required shape and size with all complete of work.
Urgent Repair of wooden steel composite Bridge over Delui River at Mouza- Chadagogra, Block PS- Sabang, Dist. Paschim Medinipur.
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1956 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 1957, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for thework including all incidental chages such as electricity charges, labour insurance charges etc. Payment to bemade on the basis of calculated weight of structural members only in finished work as per ISspecified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7%of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15% of weight for finished structal membersweighing less than 22.5 Kg. / m. may beincreased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment beingmade for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level fromthe ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof.
Urgent Repair of wooden steel composite Bridge over River Benidighi Khal at Mouza-Baharampur, Block PS- Narayangarh, Dist. Paschim Medinipur.
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1956 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 1957, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for thework including all incidental chages such as electricity charges, labour insurance charges etc. Payment to bemade on the basis of calculated weight of structural members only in finished work as per ISspecified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7%of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15% of weight for finished structal membersweighing less than 22.5 Kg. / m. may beincreased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment beingmade for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level fromthe ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof.
Urgent Repair of wooden steel composite Bridge over River Benidighi Khal at Mouza- Panchpara, Block PS- Narayangarh, Dist. Paschim Medinipur.
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1956 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 1957, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for thework including all incidental chages such as electricity charges, labour insurance charges etc. Payment to bemade on the basis of calculated weight of structural members only in finished work as per ISspecified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7%of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15% of weight for finished structal membersweighing less than 22.5 Kg. / m. may beincreased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment beingmade for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level fromthe ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof.
Surandai Municipality Maintance and Providing Fencing of Ward No.2 Compost Yard For Vermi compost
Supply and fixing of M.S Grills with Doors and Windows with one coat of Red oxide with Primer including all costs such as welding,grinding and fabrication charges, cost and conveyance of all materials to site etc,complete as per standard specification.
as per NIT
Fabrication, galvanising and supply of foundation bolt and nuts with 2 nos. washer in High Tensile Steel including 10 cm L at bottom and 15 cm threading with 2 nuts and washers at top including cost of materials, labour, lead & lift etc., complete as directed by the department engineer at site. (20mm dia -1m length)