Loading…
Loading…
47,618 results • Best match
Repairs to Toilets & Bathrooms, Doors & Windows, Painting, Flooring, Over Head Tank and Compound wall at Govt. BC Girls Hostel at Gonegandla (V&M) in Kurnool District
... complete but excluding cost of steel and it’s fabrication charges for finished item ...
Construction of RCC Slab Culvert (2 Nos) at Manthiripattinam - Thiruvathevan PUES School
Supply anf fabrication charges for Steel including cost and conveyances of all matrials and labour charges
Construction of RCC Slab culvert( 2 nos) at Manthiripattinam Kallamparai link road in Thiruvathevan panchayat
Supply anf fabrication charges for Steel including cost and conveyances of all matrials and labour charges
Construction of RCC Slab culvert( 2 nos) at Ammanichatram East street road in Vilangulam panchayat
Supply anf fabrication charges for Steel including cost and conveyances of all matrials and labour charges
Construction of RCC Slab culvert (2 no) and Retaining wall to Kallamparai AD Street in Solaikkadu Panchayat in sethubavachatram Block 2025 2026
Supply anf fabrication charges for Steel including cost and conveyances of all matrials and labour charges
mukhya gaon ankhisar ke dakshin disha mein shamshan bhumi ki dakshin paschim seema se utrai purva seema ki aur char vaili nirman karya evam anya vikas karya
Steel Work: Gate fabrication and installation.
Mechanical repairing/ re-strengthening of bend pulley (04 Nos.) of belt conveyor 502 and 704 at Moonidih Coal Washery.
Fabrication & Erection of steel work
Mechanical Repairing/ Restrengthening of Gear box frame and Drive Assembly base frame with coupling replacement for conveyor unit 502 at Moonidih Coal Washery.
Fabrication & Erection of steel work
Mechanical Repairing/ Restrengthening of bend pulley (04 Nos.) of belt conveyor unit 801-A and 801-B at Moonidih Coal Washery.
Fabrication & Erection of steel work
Mechanical Repairing/ Restrengthening of Bend pulley assembly and Take-up drum of Conveyor unit 901 at Moonidih Coal Washery.
Fabrication & Erection of steel work
Structural repairing/ Re-strengthening of discharge chute and supporting frame work of unit C-1 belt conveyor at Moonidih Coal Washery.
Fabrication & Erection of Steel work
Mechanical Repairing/ Restrengthening of Head and Snub Drum assembly of Conveyor Unit 901 at Moonidih Coal Washery.
Fabrication & Erection of Steel work
Mechanical Repairing/ Restrengthening of Snub and Tail Drums of Conveyor unit 901 of Moonidih Coal Washery.
Fabrication & Erection of Steel work
Mechanical Repairing/ Restrengthening of Gearbox base frame and drive assembly base frame with coupling replacement for conveyor unit 702 at Moonidih Coal Washery.
Fabrication & Erection of steel work
Mechanical repairing/ restrengthening of Structural frame work of head drum and snub drum assemblies of conveyor unit 301-B at Moonidih Coal Washery.
Fabrication & Erection of Steel work
Mechanical Repairing/ Restrengthening of Gear box Base Frame and Drive Assembly base frame with Coupling Replacement for Conveyor unit 701 at Moonidih Coal Washery.
Fabrication & Erection of steel work
Mechanical Repairing/ Restrengthening of bend pulley (4 Nos) of belt conveyor unit 701 and 702 at Moonidih Coal Washery.
Fabrication & Erection of Steel work
Mechanical repairing/ re-strengthening of Discharge chute and supporting frame work of unit 801-B and C-2 conveyor belts at Moonidih Coal Washery.
Fabrication & Erection of Steel work
Repairing and strengthening of the base frame work of the gear box and drive assembly, including coupling replacement work for conveyor unit unit 801-B at Moonidih Coal Washery.
Fabrication & Erection of steel work
Mechanical Repairing/ Restrengthening of Gear box Base Frame and Drive Assembly base frame with Coupling Replacement for Conveyor unit 704 at Moonidih Coal Washery.
Fabrication & Erection of steel work
Construction of CC Drain with filling of Kandakam at Parsapur Village of Kodangal Mandal in Vikarabad District-E/C Rs.100.00 Lakhs-Sanctioned under KADA 2025-26 2nd Call
... complete but excluding cost of steel and its fabrication charges for finished item ...
Construction of Division Office building for Lines/South at 33/11 KV Hyderguda Substation in SCADA Circle, Hyderabad under General Category
... complete but excluding cost of steel and its fabrication charges for finished item ...
Maintenance of Peraru to Thongumalai Forest Road at Amirthi Range, Vellore Division. From Km 0/000 - 10/850 during 2025-2026
... Thongumalai Road Supply and fabrication of STEEL grade Fe500 with suitable... shedule including cost of steel, cost of fabrication, labour charges for cleaning ...
Construction of Community sanitary complex at Nagoor H/o Valaikombunagoor Panchayat
Supplying and Fabrication of steel for RCC works including ...
Replacement of Damaged Structural in Phosphoric Acid Plant and Pollution Control Areas.
... transport to the work site. New structure shall be fabricated as per the instruction of... and replaced with newly fabricated one / modified structure to meet the site requirement. ...
HT and LT Powerline Modification in Thiruvananthapuram to Eraniel section (Phase- III), left over LT modifications in Eraniel - Nagarcoil town section and HT/LT power line modification in Thiruvananthapuram South Railway yard
... transportation and stacking of fabricated steel angles, pipes, channels ...
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - IC- 303 H 001 Hight pressure cleaning of underwater area Approx 30 sqmt and super structure area Approx 20 sqmt along with painting of super structure area and touch of ... be fabricated as ... be fabricated as ... hull structure including ... super structure and ...
Increasing Capacity of SS
iii) C.C. work of ratio 1:3:6 (cement, coarse sand and 02 Nos. structure, pre-fabricated Bus-bar Gantry size of Plinth (0.75x0.75x2.10)m, 4 Nos. after proper ramming over stone pad.
WBPHE/EE/JMD/NIeT 11_11 OF 2026-2027
Charges for fabrication including metal arc welding conforming to ...
Construction of additional class rooms in the existing Govt. HS (G) Red Cross, Masabtank Masabtank under Core Urban Region Economy in Hyderabad District
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Construction of additional class rooms in the existing Govt. PS Kurmaguda, Madannapet Market under Core Urban Region Economy in Hyderabad District
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Balance Community hall Work at 5incline Junction in Bhupalpally Municipality under Nagaraabhivrudhi Grant
... seignorage charges, cost of steel and its fabrication charges for finished item ...
Construction of additional class rooms in the existing Govt. PS Prabhatnagar at Prabhatnagar under Core Urban Region Economy in Hyderabad District
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Increasing Capacity Works
d) C.C. work of ratio 1:3:6 (cement, coarse sand and 25 mm stone grit) for pre-fabricated structure of Line and Bus isolator size of plinth (0.9×0.3×1.00)m for 04 Nos.
Increasing Capacity Works
d) C.C. work of ratio 1:3:6 (cement, coarse sand and 25 mm stone grit) for pre-fabricated structure of Line and Bus isolator size of plinth (0.9×0.3×1.00)m for 04 Nos.
STRENGTHENING OF ADDITIONAL INFRASTRUCTURE FACILITIES TO EXISTINVG KGBV BUILDING AT RAGHAVAREDDYPET AT TEKUMATLA (V AND M) IN JAYASHAKNKAR BHUPALPALLY DISTRICT UNDER NABARD RIDF XXIX
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Manufacturing, Supply, Installation, Testing and Commissioning of Signage and Graphics for 14 Nos. of Elevated st. and 01 No. Depot of Corridor-02 of AGMRP and 5 No. of Elevated St., 03 Nos. of Underground St. and 01 No. Depot of Corridor-02 of KMRP
Suspenders Fabrication: Steel work in built up tubular... after completion of all fabrication including drilling of hole ...
Laying and Jointing of 6inch and 10inch dia M.S Pipe and HDPE pipe new range from sump to River side discharge point at Jamunia patch of ABOCP mine.
Fabrication of 8" dia tapper pipe/tapper
Replacement of belt conveyors and structurals for pith conveyor#05 tailend at Energy Mech
Fabrication and erection of belt conveyor structurals like walkway, main support, stringer channel head drum support, tail drum support etc(GEN)
Replacement of Lamella modules, Stilling plates with PVC profile sheets of Pulsa-tube clarifier at 900MLD WTP
1 Replacement, supply, Fabrication, assembly, installation, ...
Different off-loading repairing and maintenance work in different screens and re-installation and alignment of snapped under hopper of 218 A/B screen of main plant of Kedla Washery.
(c) Fabrication & erection of items as (b) and Fabrication & erection of liners,
A) Replacing and lowering of MN-6 pump at Madhuban Incline, (B) Replacing and lowering of 60 HP Motor at South Mandra AMP Colliery, Barora Area.
Fabrication & fitting of M.S. 6" and 4" dia bend
Construction of 2 lane ROB in lieu of L-Xing No. 85-Spl at KM 1038/13-15 on CNB- RURA section in Prayagraj Division of North Central Railway
... complete assembly to be of cast steel / fabricated structural steel, metal and elastomer elements complete ...
Repairing of Damage Cement Concrete Lining of Mahanadi Main Canal from 83.40 Km to 85.50 Km in Block Arang, District Raipur
Akanksha Construction and fabrication ( 442323 )
Repairing of Damage Cement Concrete Lining of Mahanadi Main Canal from 85.75 Km to 87.30 Km in Block Arang, District Raipur
Akanksha Construction and fabrication ( 442323 )
SELECTION OF AN AGENCY TO FACILITATE THE PARTICIPATION OF UTTAR PRADESH TOURISM IN UTTAR PRADESH INTERNATIONAL TRADE SHOW UPITS GREATER NOIDA 2026
... Conceptualization, Designing, Fabrication, Display, Showcasing & Facilitating ...
Package No-1 SBM - Palavanatham Panchayat
Supplying and fabrication of Steel inculding cost and conveyance of steel to site and all labour charges for straighteing, Cutting to Length
Strengthening of Additional Infrastructure Facilities to Existing KGBV Building at Nirmal Urban (V) Nirmal Urban (M) in Nirmal District under NABARD-RIDF-XXIX
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Construction of New Office of the DMO, AYUSH, Kalimpong, GTA.
Labour charge for fabrication and installation of composite... alloy aluminium sectios, fabrications, including cutting to proper ...
Make Provision of nurses changing room and aluminium window at P. P. Unit and fixing of grill gate with fabric mesh at LR complex of Gynae ward and provide some grating grill for drain cover and necessary civil works for repairing ward master and tic
Labour charge for fabrication and installation of composite... alloy aluminium sectios, fabrications, including cutting to proper ...