Loading…
Loading…
32,873 results • Best match
CONSTRUCTION OF STORM WATER DRAIN AND CULVERT AT THIRUVALLUVAR NAGAR-2
Supply and fabrication of steel rod required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the roads straightening, cutting, bending, tying, including ...
STANDING ORDER FOR EXECUTION OF BALANCE MECHANICAL, PIPING AND PAINTING WORKS FOR GRAIN BASED ETHANOL DISTILLARY UNIT AND OTHER AREAS AT HBL LAURIYA, WEST CHAMPARAN, BIHAR
Supply, Fabrication and Erection of Structural: The job includes supply, fabrication, welding, erection in position of structural members at all elevation as per drawing. The rate is inclusive of all Machinery like ...
STANDING ORDER FOR EXECUTION OF BALANCE MECHANICAL, PIPING AND PAINTING WORKS FOR GRAIN BASED ETHANOL DISTILLARY UNIT AND OTHER AREAS AT HBL SUGAULI, EAST CHAMPARAN, BIHAR
Supply, Fabrication and Erection of Structural: The job includes supply, fabrication, welding, erection in position of structural members at all elevation as per drawing. The rate is inclusive of all Machinery like ...
AS PER BOQ
... of reputed make confirming to BIS on delivery line of the Column pipe and fitting by fabrication and fitting of flanges, rubber gaskets, nuts, bolts, etc Fabrication of well cap, tie rod along with bend, elbow for delivery of water. Providing, fitting ...
Construction of Road Over Bridge at Km 75 6 of Chennai Tiruttani Renigunta Road SHU 148 in addition to existing two lane Road Over Bridge
Supplying and Fabrication of Fe-500D Corrosion Resistant Steel (CRS) required for all RCC items of works involved in the schedule, including cost of steel at site and the cost of fabrication, labour charges for cleaning the rods, straigntening, cutting,bending,tying grills, including ...
Construction of RCC Drain and Approach road to Gokarna-Vaddi-Devanhalli SH-143 at Km 10.40 Ankola in Uttarakannada District.
Steel Fabrication