SITC of three (03) nos 1.5 TR Capacity Split Air Conditioning Machine at Uttar Dinajpur District Drugs Control Office, Quarter No- M77, Karnajora RHE, Raiganj attached to Berhampore Electrical Section under Electrical Sub-Division No-III, H.D
Supply & Installation of HVAC grade 5/8”(for suction) & 1/4”(for discharge) copper refrigerant pipe with 9mm thick nitrile rubber insulation including shaddle,screw, insulation tape, fastner etc for above AC machine as per direction of EIC.
Setting up of UG Cabling Network, Smart Grid Application incl. SCADA, ADMS, OMS, GIS Mapping, OFC, Control Centre and Distribution Network Automation in Agartala MC Area (Package-A)
SITC of complete 33/11 kV Prefabricated E-House Substation (turnkey) — 2 nos. 33 kV SF6 Incomer Panels, 1 no. Bus Coupler, 6 nos. 11 kV VCB Outgoing Feeder Panels, Bus Ducts, Aux Transformer, PLC/RTU Panel, MCC/APFC, Containerized Structure, HVAC, Fire Detection (VESDA), CCTV, earthing, civil foundation, FAT/SAT, commissioning. IEC 62271/IS 13118 compliant.
ADDITIONAL IMPROVEMENT WORKS TO CONVENTIONAL CENTRE AT SEMMOZHI POONGA
PUF Panelled Door - For HVAC Room Supplying and fixing of 60 mm thick PUF insulated panel door suitable for HVAC room application, complete with heavy-duty stainless steel hinges, EPDM rubber gaskets for air-tight sealing, and necessary hardware for smooth and secure operation. The PUF door panel shall be constructed with factory-finished pre-coated galvanized steel or stainless steel outer skin, injected with CFC-free polyurethane foam insulation of 40 ±2 kg/m³ density. The total door thickness shall be 60 mm, ensuring proper thermal insulation and air-tightness suitable for HVAC environments. The door shall include heavy-duty SS hinges, SS handles, and lockset of approved make, along with EPDM weather seal gaskets fixed around the perimeter to ensure proper sealing. The frame shall be fabricated from powder-coated GI or SS section as per approved design. All complete as per approved drawings or manufacturer’s specifications and as instructed by the Department Engineer.
Providing fully comprehensive annual maintenance for ventilation system and allied electrical panels installed at Mazgaon Court Building, Mazgaon, Mumbai.
Annual Comprehenssive Maintenance of Programmable Logic controller with main components like power, processor, input & output cards, an open protocol for interface with the BMS systems. PLC to be complete as per specs installed inside the Main Switchgear MCC panel. The PLC shall have a FULL MODBus / BACnet / Eithernet interface facility with the Central BMS system. Scope to include the Gateway or converter, Communication module, HVAC software in addition to the standard features.Minimum Specifications of a Controller are as follows : a) 10 x analogue inputs for CO or other pollutant sensors. (0-20mA, 0-5V and 0-10V input available). b) 16 x digital inputs for fan run/fault status.c) 1 x emergency alarm (i.e. fire) digital signal inputs. d) MODBUS, BACnet and other protocols for supervisory connection with BMS system. Built-in communication - Modbus slave serial link by means of connection on integrated RJ45 port (Modbus master/slave serial link on integrated RJ45 port). e) 3 x analogue outputs available to speed control groups of JetVent Fans, central car park exhaust fan or supply fan. f) 3 x digital outputs to drive speed control relays (for 2 speed fans) or other systems according to pollutant concentration.Other Standard Details which the Basic Controller shall have are as follows:a) Programmable Logic Controller with HVAC softwareb) Dedicated PWM programmable output.c) Programmable Anagol Outputs/Inputs 0 - 10 V, 0 - 20 mA, 4 - 20 Ma d) Display block for displaying the controller status: 4 LEDs (PWR, RUN, ERR and EXP) and 1 LED that can be used in the application.e) Connector for a removable terminal block (1) (2 terminals) for connecting the 24 V c/a supply.f) RJ11 connector marked Prg. Port for connecting a programming port g)Connector for a removable terminal block , for connecting analog inputs. h) Connector for a removable terminal block for connecting discrete inputs. i) Connector for a removable terminal block, for connecting analog outputs. j) RJ45 connector, for connection to the odbus™ bus.k) RJ45 connector, for connection to the Modbus bus. l) Five Modbus bus and expansion bus polarization and line terminator adjustment switches. m) Connector for a removable terminal block, for connecting the expansion bus. n) Connector for a removable terminal block to connect the power supply for a remote display unit. o) Connector for a removable terminal block, for connecting 4 discrete relay N/C outputs. p) Connector for a removable terminal block for connecting the discrete relay C/O output. q) Display with 6 command buttons for setting the controller parameters r) logic controllers are mounted as standard on a 35 mm DIN rail. Supply, laying, testing and commissioning of 600/1000V Copper Conductor FRLS insulated PVC Sheathed Armoured - IEC 60502, with max short circuit temperature 300⁰C. The scope covers servicing & replacement of minor switch gears ( 2 Panels x 12 Months = 24 Job)
SUB-CONTRACTING OF FINAL GROWTH OF WORK AND RE-WORK FOR ASW SWC SHIP YD 3029
BOOK OF POWER HVAC CABLE SIZE REVISED
COMPREHENSIVE MAINTENANCE OF SENSITIVE E M INSTALATIONS OF NCN DATA CENTRE AT INS JATAYU UNDER GE NAVY LAKSHADWEEP
Supply and fill refrigerant R-410A as per existing compressor of HVAC VRF outdoor unit system capacity of 6 HP suitable for existing Hitachi make complete all as specified and as directed.