Loading…
Loading…
950 results • Best match
SPL REPAIR TO ALL THE INTEGRATED ANALYSIS GROUP IAG ROOMS AT NDC UNDER GE NEW DELHI
The system shall meet EUROVENT ePM 1.0 80% requirement and ASHRAE guideline for SARS-CoV-2 inactivation. • The system should have a UL certified inbuilt pneumatic sensor allowing it to work as a controller (optional). It must automatically detect airflow and the capability to interface with the building management system. If the HVAC system is turned ON and the airflow is detected, then the output power should be available to the system, otherwise the system shall automatically turn off for the protection of service personnel. APPROVED MAKES : Trane/Dr Air / Magneto
Supply, installation , testing and commissioning of Centralized Air-conditioning system by VRF Air conditioner units including allied Electrical installation and fire fighting sprinkler arrangements in the 2nd floor of NPKRR Maaligai in TNEB HQ.
CONTROL MODULE SITC of "Addressable Control Relay Modules”, UL Listed with necessary interposing relays. Control module shall be used for emergency control functions including shutting down Fire dampers in AHU's, tripping of AHU's, DDC Panel Integration, FACP integration, PA System Interface & HVAC Incomer power trip. The module should be supported independently of their attachment to wirings using necessary mounting accessories with GI 4 X 4 Junction Box with cable gland, clamps/brass screws etc for mounting at True ceiling. Make : Honeywell/cooper/Siemens
SPECIAL REPAIR OF SENSITIVE E/M INSTALLATIONS OF NCN DATA CENTRE AT INS DWEEPRAKSHAK UNDER GE (NAVY) LAKSHADWEEP
S&F base structure for chiller plant/ pump base/ HVAC VRF base section with gusset plates, channel, rails, braces, etc., complete, drilled for fixing of steel sheeting or other covering also grouting and fixing complete conforming to Fe-410-W (Gde-E-250) Quality-A, two coats of synthetic enamel paint over a coat of red oxide primer including preparation of new steel surfaces over 10 Cm width or girth suitable for existing system complete all as specifieid and directed.
SITC of additional VRV Air- Conditioning sytem in Terminal Building at MVI Airport, Ayodhya Dham
Consultancy charges for heat load design of HVAC system as per enclosed ambient conditions of existing Terminal building of Ayodhya Airport by specialized agency/consultant using HAP /latest software and applicable tools etc. including visit at site to collect details of building/data , submission of heat load calculation in hard copy as well as in soft copy area wise and as total heat load of building . The heat load of building shall be designed in two parts (i) Total heat load along with effect of sky light (ii) Total heat load without effect of sky light etc. complete as required.
Electro Mechanical Works of 3x100 MW Lakhwar MPP on EPC basis.
HEATING, VENTILATION AND AIR CONDITIONING SYSTEM (HVAC)
SH Supply and replacement of AHUs and miscellaneous work
Supplying, installing, testing and commissioning of microprocessor-based digital temperature controller suitable for HVAC applications complete with the adjustable set point temperature control with digital display, compatible external temperature sensor (PT1000/ NTC as required), including sensor pocket where applicable, controller suitable for ON-OFF / Modulating control of two-way motorized control valve, control output signal compatible with actuator (0–10V DC / 4–20 mA), necessary power supply unit (230V AC / 24V AC/DC as required) and mounting accessories, internal and external wiring, terminal connections etc as required.