Loading…
Loading…
3,510 results • Best match
construction of Retaining wall to prevent erosion of soil caused by heavy rainfall in Hotel Manimahesh Dalhousie Distt. Chamba (H.P)
Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m Ordinary rock as per the diretion of Engineer in Charge at site.
Construction of retaining wall in approaching road at Hotel Kashmir House Dharamshala Distt. Kangra (H.P)
Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m Ordinary rock as per the diretion of Engineer in Charge at site.
New Construction Work from KM 6 (HM 2-4) of Chiledi Manjuli Motor Road to Chaurikhal Sirwadi Kanda Motor Road (Phase II, Stage I) Under State Sector.
Unloading of Earth, Sand, Lime, Moorum, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Manure, Crushed Slag, Flyash, Stone for Masonry Work by mechanical means. (Placing tipper at unloading point excluding time for haulage and return trip)
Construction of temporary gates, sheds, Stages for various Government programs.
Labour charge for fitting fixing of G.I sheet on bamboo frame , tied with GI wire on roofing & walling etc. complete in/c loading of GI sheet required for the work on mechanical transport and unloading at work site in/c dismantling properly & reloading & unloading at the stack yard complete as per direction of the Engineer in charge.
Fire Station to Bus Stand via Ambedkar Stadium and Gandhi Park and Janmanch to Old Gangoh Bus Stand on Ambala Road via Jal Nigam Office
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 4 metres lead as per direction of Engineer-in-charge. In cement mortar For Drain Dismantalling
Trans-Grid downstream work-Bay Extension of 110 KV Substation, Medical College- Providing Yard Metalling and Fencing
Excavating earth work by mechanical means (Hydraulic excavator) / manual means on foundation trenches of drains ( not exceeding 1.5 m in width or 10 m2 on plan,)including dressing of sides and ramming of bottom ,lift up to 1.5 m , including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. in all kinds of soil.