Loading…
Loading…
3,504 results • Best match
Remodeling of storm water drain as per New Master Drainage Plan 2025 from Azadpur H-Point to Mukarba Chowk on Mall Road Extension under SD NR-12 of North Roads Divn,PWD, Delhi (SH-Micro tunneling with trenchless technology method at Mukarba Chowk)
Providing & fabrication of MS pipe i/c specials of any size on ground or upto 3 Meter depth below the ground made out of 16 mm Thick MS plate i/c welding, cutting, painting both side with black anticorrosive bitumastic paint of approved brand and tested to a head of Rate 15 kg/sqm conforming to 15 3589/1981, IS 7322-1974, 15 784-1978 and relevant codes i/c cost of plate and carriage at site complete as directed by Engineer-in-Charge. (actual weight will be paid)
Annual Pump and Motor Maintainance Work for the year 20267-27
Re-errection charges of Pumping machinery including overhauling and painting
Annual Pump and Motor Maintainance Work for the year 20267-27
Re-errection charges of Pumping machinery including overhauling and painting
Annual Pump and Motor Maintainance Work for the year 2026-27
Re-errection charges of Pumping machinery including overhauling and painting
Kadinamkulam Devaswom in Ulloor Group-Constructing compound wall at West and South side of the temple compound
Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
Operation and maintenance of complete sewer net work manholes chamber, flushing tanks and STP of 3.13 MLD for 3 years period
To operate, repair & maintain all civil works and electro-mechanical equipments relating to sewerage system to Zone No. I of Hamirpur town which consist of sewage treatment plant and sewer network including cost of 1 No. monthly sample testing charges by HPPCB for the period of 3 year in all respect to the entire satisfaction of Engineer-in-Charge. Firm should do comply the stringent effluent standards laid down by HP. Pollution Control Board and terms and conditions as per Annexure A to M alongwith general terms and conditions. Operation, Repair and maintenance shall cover following components.