Loading…
Loading…
3,504 results • Best match
Operation and maintenance of complete sewer net work manholes chamber, flushing tanks and STP 1.35 MLD for 3 years period).
To operate, repair & maintain all civil works and electro-mechanical equipments relating to sewerage system to Zone No. II of Hamirpur town which consist of sewage treatment plant and sewer network including cost of 1 No. monthly sample testing charges by HPPCB for the period of 3 year in all respect to the entire satisfaction of Engineer-in-Charge. Firm should do comply the stringent effluent standards laid down by HP. Pollution Control Board and terms and conditions as per Annexure A to M alongwith general terms and conditions. Operation, Repair and maintenance shall cover following components.
Operation and maintenance of complete sewer net work manholes chamber, flushing tanks and STP 0.68 MLD for 3 years period)
To operate, repair & maintain all civil works and electro-mechanical equipments relating to sewerage system to Zone No. III of Hamirpur town which consist of sewage treatment plant and sewer network including cost of 1 No. monthly sample testing charges by HPPCB for the period of 3 year in all respect to the entire satisfaction of Engineer-in-Charge. Firm should do comply the stringent effluent standards laid down by HP. Pollution Control Board and terms and conditions as per Annexure A to M alongwith general terms and conditions. Operation, Repair and maintenance shall cover following components.
Operation and maintenance of complete sewer net work manholes chamber, flushing tanks and STP of 0.57 MLD for 3 years period )
To operate, repair & maintain all civil works and electro-mechanical equipments relating to sewerage system to Ward No. 11 of Hamirpur town which consist of sewage treatment plant and sewer network including cost of 1 No. monthly sample testing charges by HPPCB for the period of 3 year in all respect to the entire satisfaction of Engineer-in-Charge. Firm should do comply the stringent effluent standards laid down by HP. Pollution Control Board and terms and conditions as per Annexure A to M alongwith general terms and conditions. Operation, Repair and maintenance shall cover following components.
Completion of west side Municipal School building in W.N-22
S/F of Mild steel tubular pipe fabrication work
REPAIR OR REPLACEMENT OF HT OVERHEAD LINES, UG CABLES OR INSULATORS, GOD, CABLE JOINTING KIT AND ALLIED WORKS AT HQ EAC (U) UNDER GE (I) (AF) SHILLONG
Supply, installing, testing and commissioning of Air-break, gang operated, triple pole switch, outdoor, horizontal mounting type (ISI marked), mechanically operated, mounted on insulators for current rating upto 200 Amps complete with fuse mounts, fuse carriers and HT fuse elements and frame work with operating mechanism worked from ground level, with locking arrnagments including Godrej pattern 65mm pad locks with two keys, complete suitable for HT 11 KV, 50 Hz AC supply and making necessary electric connections, complete all as directed.
Construction of desilting basin at outlet of plant drain and Gate inplant boundary near coal gate Township at North Karanpura STP
Mechanical works