Loading…
Loading…
3,339 results • Best match
Revamping of new structural roof at MSP sillimanite section at IREL Plant, Chavara
[15.3] - Demolishing R.C.C. work manually/ by mechanical means including stacking... specification Demolishing R.C.C. work manually/ by mechanical means including stacking ...
Misc. Civil Works Relating to Building /Shops. Roads and Drain in HEEP
Demolishing R.C.C. work manually/ by mechanical means including stacking ...
Refurbishment of ETC 4 including the Construction of Flooring and Trenches, at ICAT Centre-I, Manesar, Haryana
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
Construction of Boundary Wall near Manasha Cement Pipe Industries and Drain at Industrial Estate Rani Kamrup
DISMENTALING: Demolishing brick work manually/ by mechanical means including stacking ...
Construction of Township Main Entrance Gate Structure at BHEL Ranipet due to Widening of National Highway
... above item No 04A but for fabricated structural steel works. Painting Co-efficient for fabricated structural will be taken as 22.19Sqm/MT.
Work for Dismantling, Design & Supply, Installation and Commissioning of GI Duct and Air Filter Assembly with Supporting Structure, and Repairing/Retrofitting & Servicing of Centrifugal Blowers and Accessories for Air Washery System of CHP – GTPS
2. As this work is to be carried in the coal handling plant, hence contractor has to prevent the
Installation of 01 No. DTH Tube-well bore at Bunty Bread Wali Gali (H. No.1717 and 1718, A-Block, SGM Nagar Ward No.16 (New Ward), Faridabad.(Recall)
Material required- Mechanical and Electrical works, detail given below. Supply and fixing of 2½” Pump Nipple G.I. new making with flange
Extension of Irrigation canal with flume from Dumbkhan pump station to onwards
Carriage of material from source upto site of work by mechanical transport,including loading,unloading and stacking etc a) 40mm stone agg av lead 12 kms
Const.of nallah Drain from main road to h.o Karan Singh and others, W.No.6, Pyt Kattal Battal, Block Nagrota Under scheme CAPEX (PRI component) For the year 2026-27 Block Level
Carriage of key construction material from source to site of work by Mechanical Transport Sand & Agg.avg. 10 km lead by MT
COMPREHENSIVE MAINTENANCE OF 33 KV SUBSTATION YARDS AT MRS AND STN HQ INCLUDING 33 KV OH LINE FROM 132 TO 33 KV STN HQ AT MIL STN JAISALMER
... steel frame with operating mechanism worked from ground level including ...