Loading…
Loading…
17,129 results • Best match
MTPS I Boiler Rotating parts Units III and IV Preventive and Breakdown maintenance Works and other allied works as and when required basis for the period of 365 days from the date of commencement of work for the year 2026 27
MTPS I Boiler Rotating parts Units I and II Preventive and Breakdown maintenance Works and other allied works as and when required basis for the period of 365 days from the date of commencement of work for the year 2026 27
Charges for cleaning the accumulated coal dust, fly ash & other waste materials and air washing of the hot primary air duct, hot secondary air duct, various floors of Air pre heater, flue gas duct, cold primary air duct, cold secondary air duct, Primary air fan, Forced draught fan, Induced draught fan and its floors, ESP CRM floor, ESP roof top, structure, floor, walk way, hand rails, pipes etc from Economizer out let to chimney in Units I & II area.
MTPS I Boiler Rotating parts Units I and II Preventive and Breakdown maintenance works and other allied works as and when required basis for the period of 365 days from the date of commencement of work for the year 2025 26
Charges for cleaning the accumulated coal dust, fly ash & other waste materials and air washing of the hot primary air duct, hot secondary air duct, various floors of Air pre heater, flue gas duct, cold primary air duct, cold secondary air duct, Primary air fan, Forced draught fan, Induced draught fan and its floors, ESP CRM floor, ESP roof top, structure, floor, walk way, hand rails, pipes etc from Economizer out let to chimney in Units I & II area.
Operation and Comprehensive Maintenance for the electro-mechanical work of Electric Crematorium comprising of Single Furnace with Pollution Control Unit at Pathak Ghat Electric Crematorium under Bally Municipality for 6(Six) months.
Operation & Comprehensive Maintenance for the electro-mechanical work of Electric Crematorium comprising of Single Furnace with Pollution Control Unit at Pathak Ghat Electric Crematorium under Bally Municipality for 6(Six) months.
Different types works i.e. replacing of B/D 4000GPM Pump at Sadbhavna pumping, recovery of damaged pipes, extension of pipe, modification of baseplate, fabrication of bends, tapper pipes and leakage repairing in different location of AMP Colliery.
eProcurement System of Coal India Limited Created By: PRAWEEN KUMAR DAS Created Date/Time: 29-Nov-2025 02:39 PM Tender Title: Different types works i.e. replacing of B/D 4000GPM Pump at Sadbhavna pumping, recovery of damaged pipes, extension of pipe, modification of baseplate, fabrication of bends, tapper pipes and leakage repairing in different location of AMP Colliery. Tender ID: 2025_BCCL_346815_1
Annual Maintenance Contract in connection with Operation and running routine maintenance and allied electro mechanical Work including painting of steel / iron surfaces to the trestle bridge, iron caging , railing etc at 14 vent sluice at the
Tender Inviting Authority: Executive Engineer, Metropolitan Drainage Mechanical Division