NCTPS I SEMI circle AOH 25 26 TM Dn Replacement of defective 450NB 600NB butterfly valves and servicing of existing 450NB 600NB butterfly valves actuators etc in Unit I II III during annual overhaul shutdown period 2025 26
Removal of all stud bolts and lifting of pipe line, removing of defective 600/450 NB mm Butterfly valve, dismantling, cleaning, servicing and renewal of internal spares in gear box, greasing, reassembling butterfly valve in original position, tightening of all stud bolts and commissioning the valve. Including cost of consumables & T&P's.
NCTPS I SE MI circle AOH 25 26 TM Dn Overhauling of VOITH make variable speed geared Turbo Hydraulic Coupling Type R16 K 1 of Boiler Feed Pump in Unit III during AOH 2025 26
Charges for Overhauling of VOITH make variable speed geared Turbo Hydraulic Coupling Typ-R16 K-1 of Boiler Feed Pump includes Decoupling the voith from pump and motor - drain the oil, removing the AOP motor and unbolt the actuator and cam control from machine - opening the top cover, Removal of the input shaft, primary & secondary wheel assembly, AOP & main oil pump - disassemble the primary & secondary wheel assembly parts, main oil pump parts and AOP pump parts, complete cleaning and inspection of all parts & bearings, renewal of worn out parts / bearings if any and assembling the same. Including consumables and T&P's.
NCTPS I SEMI circle AOH 2526 TM Dn Overhauling of Electrical Actuators in Condensate Feed water and Extraction Lines of Turbine Feed Water System for UnitI II III during Annual Overhaul 2025 26
Overhauling of actuators (K60,K150,K300 & K600) by removing the actuators from Condensate lines and Exaction line and completely dismantling of centre column, worm & worm wheel auto/manual clutch mechanism along with yoke, limit switch transmission drive shaft, motor switch mechanism and complete inspection, cleaning of individual components rectification of defects if any found in clutch, centre column, spring washer other components, changing of damaged centre column oil seal limit switch drive, shaft oil seal ‘o’ rings motor ‘o’ring, reassembling of all the components, setting limit switch, including of oil drains and topping up, reassembling the same after rectification/reconditioning valve and actuators, checking the Manual/Remote operations of the valve with actuators. Including consumables and T&P’s.
NCTPS I SE MI Circle AOH 25 26 TM Dn Cleaning of condenser titanium tubes with Rotating water jet in Units I II III during AOH COH Shutdown for the year 2025 26
NCTPS I SE MI circle AOH 25 26 TM Dn FWS Hydraulic Test of HPH LPH tubes and Inspection and identification of tube puncture in nest plugging the punctured tube and welding and Renewal of gaskets in water end manhole door
Charges for Removal of studs in HP heater water box manhole door and positioning the man hole door trolley over the working platform, removal of manhole door and partition plate manhole door and inspection. Including cost of consumables and T&P’s.
NCTPS I SEMI circle AOH 25 26 TM Dn Overhauling of various sizes of Motor Hand operated valves in Feed Water Suction FS Discharge lines FD Condensate lines CD and Isolation valves in LP HP heaters drip lines Pneumatic Motor operated
Charges for OVERHAULING OF GV 200/250ATA GATE VALVE MOTOR OPERATED IN BOILER FEED PUMP SUCTION LINE (FS 1,2,3) for 1,2 & 3units., including of consumables and T&P charges.