NCTPS I SEMI circle AOH 2526 TM Dn Unit I II III Attending Overhauling works in debris filter systems etc during Annual Overhauling shutdown period 2025 26
Replacing of 1 No. defective ‘O’ ring/Flap seal in inlet butterfly valve (Dynamic-make 1600 NB) of debris filter of size 1575x18mm thick - charges for Loosening the bolts and nuts, removing the worn out existing neoprene rubber Flap seal (seating) and erection of new Flap seal and tightening the bolts and nuts in debris filter inlet butterfly valve (1600 NB) and commissioning including cost of materials, consumables & T&P's.
NCTPS I SE MI Circle AOH 25 26 TM Dn Removal servicing of crank lever shaft sleeve and renewal of O rings refixing of shaft sleeve in condenser cooling water inlet outlet butterfly valves in Units I II III during annual overhaul shutdown period
Removal of crank lever from its position by heating, arresting the butterfly valve disc, removal, overhauling and refixing of shaft and sleeve of butterfly valve and reassembling crank lever intact in condenser cooling water inlet/outlet butterfly valves including consumables and T&P's.
NCTPS I SE MI circle AOH 25 26 TM Dn Unit III Cutting ReConditioning and Erection of Damaged passing of High pressure Feed Water Suction valves and Extraction 13 valve in Turbine Feed Water System in Unit III during AOH period 2025 26
Charges for Arresting the Boiler Feed Pump Suction pipe line Dia 268 and 28mm thickness and releasing it after works. Including consumables, Transportation and hire charges of T&P's.
NCTPS I SE MI circle AOH 25 26 TM Dn Unit III Cleaning grit blasting and applying a coat of zinc rich primer and brushable ceramic epoxy material to an average thickness of 3000 microns in condenser 1600NB Left and Right side inlet pipe line
Transporting the scaffolding material to work spot providing the scaffolding arrangement inside the condenser1600 NB inlet Left side inlet pipe line from ‘0’ meter area to below 5 mtr area upto before the debris filter outlet 1600NB flange at inner surface area and removal of scaffolding arrangement after completing the work of including cost of consumables & T&P's.
NCTPS I SE MI circle AOH 25 26 TM Dn Unit I II III Overhauling of MS HRH strainers by cutting the drain pipe lines dismantling replacing the grafoil sealing rings during annual overhaul works of turbine for the year 2025 26
Overhauling of MS strainer by cutting the header pipe lines, dismantling the strainer screen, sealing segments, bottom plate, remove the old sealing ring, transporting the strainer removing fixture and preparing, positioning the fixture and renewal of jammed/ damaged studs in bottom of the strainers by enlarging all the six holes and make new threads and fix the new stud with nuts in the threaded holes. Inspecting and polishing the seating area of blanking device and housing, preparation of new strainer gasket. DPT checking of blanking device and strainer element welding, assembling the strainer element. After complete overhauling of strainer and assembling the same in intact position through supporting fixture with new grafoil gasket. Assembling the dummy cover, tightening the studs, welding the drain line pipe by IBR welder. Including the cost of consumables and hire charges for T&P’s. (The new grafoil sealing ring required for the above work has to be supplied by the contractor).
NCTPS I SE MI circle AOH 25 26 TM Dn Unit III Removal of deteriorated cladding from the inner surface of entire condenser 1600NB outlet bend with pipes inner surface area Right side and rebuild the entire area in loctite fix master
Transporting the scaffolding material to work spot providing the scaffolding arrangement inside the condenser outlet bend pipes right side to facilitate the protective coating in condenser out let bend pipes inner surface area Right side and removal of scaffolding arrangement after completing the work of including cost of consumables & T&P's.