Loading…
Loading…
20,863 results • Best match
Structural maintenance works in BHEL Township for one year period 2026_27
(DAT.CP10.2) Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting and applying priming coat of approved steel primer all complete. (fabrication of Structural Steel only without erection in position of fabricated items). material will be issued free of cost from BHEL @ stores.
State Plan-2025 - 26 - TSS - Construction of new well-and connected work at Pattoor pump house-Sewerage Work
100.37.6.5:Grinding cut and weld edges of 150mm (I.D.) M.S. pipes during fabrication work including all labour and hire charges of tools etc., complete: For pipes fabricated with 8mm thick M.S. plates.
WSS to Vengola, Rayamangalam Panchayaths-Construction of 3LL Sump at Karippelipady in Rayamangalam Panchayath
100.37.8.5:Grinding cut and weld edges of 250mm (I.D.) M.S. pipes during fabrication work including all labour and hire charges of tools etc., complete: For pipes fabricated with 8mm thick M.S. plates.
1) RMO Electrical and Mechanical services installed at Trade and Taxes Building, New Delhi. 2) RMO Electrical and Mechanical Services installed at MSO Building, I.P.Estate, New Delhi. (SH Fixing of drain pipes and Trays for STAC/WTAC)
2.00 Shree Jee Electrical and Mechanical Works (GSTN-07ABEPW2919F1ZJ) BID ID -1702136 2281319.00 -20.95 1803382.67 Eighteen Lakh Three Thousand Three Hundred and Eighty Two
PROVIDING SEWERAGE SYSTEM IN PIPLI, BIR PIPLI and 6.50 MLD INTERMEDIATE PUMPING STATION FOR PIPLI, BIR PIPLI
2.1.2 Sewer Line Installation and Pressure Plea Installation Installation of HDPE product pipe by HDD method for on grade gravity sewer including preparing and setting up the plant and equipment, preparing new pipe-work material, making of entry and exit pits upto 5 meter depth, installing new pipe-work ...
GENERAL-Repair and Rehabilitation of Hospital and Administration Building, GHMCT Repair and Rehabilitation-General Civil Work-1
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.