REPAIR REPLACEMENT MAINT RE-ROUTING OF CI DI GI DISTRIBUTION SYSTEM INCLUDING MS PIPE LINE HEADER AND CONNECTED ITEMS AT 2 SIGNAL COY AND IHQ TPT COY, SP MARG, DK II AREA, NICHOLSAN RANGE, RIDGE AND RISING MAIN INCLUDING MS PIPE LINE HEADER AND CONN
... by HDD (Horizontal directional drilling method) including preparing and setting up the plant and equipment .Preparing new pipe work material including all related civil work and mechanical work like excavation, shoring/strutting etc drilling, stringing, reaming and pulling back ...
GENERAL Finishing works to Maternity Block Pazhayangadi Taluk Hospital Kannur SITC of 200kVA USS and 160kVA DG set and Allied Electrical Works General Electrical Work
OD274374/2025-2026:Supply and providing the following size of B class GI pipe conforming to relevant IS specifications complete with heavy guage specials such as bends, ...
DEPOSIT-INSTALLATION OF 20 KVA DIESEL GENERATOR AT WOMEN PRISON AND CORRECTIONAL HOME,VIYYUR.-DG INSTALLATION-General Electrical Work
... series, 3 cylinder, In-line 4 stroke, radiator cooled engine Robust and efficient air handling system with • Dry type, replaceable paper element air cleaner with restriction indicator... altitude capabilities Optimized fuel consumption with Inline fuel pump with A1 class mechanical governing Spin on fuel filter Cooling system is designed and tested for 45°C ambient ...
TENDER FOR LAYING AND CONSTRUCTION OF U/G STEEL PIPELINE and ASSOCIATED WORKS FROM HAROHALLI TO THE BAMUL PLANT IN THE RAMANAGARA GA.
Contractor shall supply all required size & type of piping material like pipes, fittings & flanges etc. as per PMS alongwith 2" NB pipe for all branch line & vent line (wherever required) including supply of all consumables, ...
Office Partitions Window blinds MS Shed and other miscellaneous civil works at Rajkot International Airport Rajkot
... preparation and submission of design and drawings of irrigation system for the horticulture works in cityside of Rajkot International Airport, Rajkot along an approximate length of 3.5 ...
Construction of New Substation
... pit will be (750x450)mm and having depth of 1/6th of the full length of the support. Erection of support, complete with providing & fixing of all G.I.Clamps size of 75x10mm, 65x8mm, G.I.Nut bolt & washer, P.G.Clamp, Stone Pad, Al. Binding wire, 'E' bracket 75x10mm, and other accessories ...